AB632,9,1023
2. "Prevailing wage rate" for any trade or occupation in any area engaged on
24any project of highway, street or bridge construction means the hourly basic rate of
25pay, plus the hourly contribution for health insurance benefits, vacation benefits,
1pension benefits and any other bona fide economic benefit, paid directly or indirectly,
2for a majority of the hours worked in the trade or occupation in the area, or if there
3is no rate at which a majority of the hours worked in the trade or occupation in the
4area is paid, then the prevailing wage rate for any trade or occupation engaged on
5any project of highway, street or bridge construction in any area shall be the average
6hourly basic rate of pay, weighted by the number of hours worked, plus the average
7hourly contribution, weighted by the number of hours worked, for health insurance
8benefits, vacation benefits, pension benefits and any other bona fide economic
9benefit, paid directly or indirectly to all persons employed in that trade or occupation
10in that area.
AB632,9,1111
(g) "Secretary" means the secretary of industry, labor and human relations.
AB632,9,1212
(h) "Truck driver" has the meaning given in s. 103.49 (1) (f).
AB632, s. 2
13Section
2. 66.293 (2) of the statutes is repealed.
AB632, s. 3
14Section
3. 66.293 (3) (title) of the statutes is created to read:
AB632,9,1515
66.293
(3) (title)
Prevailing wage rates and hours of labor.
AB632, s. 4
16Section
4. 66.293 (3) (intro.) of the statutes is renumbered 66.293 (3) (am) and
17amended to read:
AB632,9,2518
66.293
(3) (am) Every
municipality
local governmental unit, before making a
19contract by direct negotiation or soliciting bids on a contract, for any project of public
20works
except, including highway, street or bridge construction, shall apply to the
21department
of industry, labor and human relations to ascertain to determine the
22prevailing wage rate
, and prevailing hours of labor
and hourly basic pay rates in all
23trades and occupations for each trade or occupation required in the work
24contemplated. The department shall determine the prevailing wage rate
, and
25prevailing hours of labor
and hourly basic pay rates for each trade or occupation
1under s. 103.49, make its determination within 30 days after receiving the request
2and file the same with the
municipality local governmental unit applying therefor.
AB632,10,15
3(bm) A Any person may request
for the a review of
any portion of a wage
4determination
may be made within 30 days
from after the determination date if
the
5person submits evidence
is submitted with the request showing that the
prevailing 6wage rate or
prevailing hours of labor for any given trade or occupation included in
7the determination does not represent the prevailing wage rate or
prevailing hours
8of labor for that trade or occupation in the area
where the proposed project is located.
9Such evidence shall include wage rate and hours of labor information for the
10contested trade or occupation on at least one similar project located in the
11municipality area where the proposed project is located and on which some work has
12been performed
during the current or any of within the previous 12 months. The
13department shall affirm or modify the original determination within 15 days
from 14after the date on which the department receives the request for review.
Reference
15to such
AB632,11,6
16(dm) The prevailing wage rates and
prevailing hours of labor determined by
17the department or a
municipality local governmental unit exempted under
par. (d) 18sub. (6) shall be published in the notice issued for the purpose of securing bids for the
19project. If any contract
or subcontract for a project of public works
except, including 20highway, street or bridge construction
, is entered into, the
prevailing wage rates and
21prevailing hours
of labor determined by the department or exempted
municipality 22local governmental unit shall be
physically incorporated into and made a part of the
23contract
or subcontract and may not be changed during the time that the contract
24or subcontract is in force. No
laborer, worker or mechanic employed directly upon
25the site of the project by the contractor or by a subcontractor, agent or other person,
1doing or contracting to do any part of the work, person described in sub. (4) may be
2paid less than the prevailing wage rate in the same or most similar trade or
3occupation; nor may he or she be permitted to work a greater number of hours
per
4day or per calendar week than the prevailing hours of labor determined under this
5subsection, unless he or she is paid for all hours
worked in excess of the prevailing
6hours
of labor at a rate of at least
1-1/2 1.5 times his or her hourly basic rate of pay.
AB632, s. 5
7Section
5. 66.293 (3) (a) of the statutes is renumbered 66.293 (11) (a) and
8amended to read:
AB632,11,239
66.293
(11) (a) Any contractor, subcontractor or agent thereof, who fails to pay
10the prevailing
wage rate
of wages determined by the department under
this
11subsection or sub. (3) or who pays less than
1-1/2 1.5 times the hourly basic rate of
12pay for
all hours worked
on the project in excess of the prevailing hours
of labor 13determined under
this subsection sub. (3), shall be liable to
the employes any affected
14employe in the amount of
their his or her unpaid
minimum wages or
their his or her 15unpaid overtime compensation and
in an additional equal amount as liquidated
16damages.
Action An action to recover the liability may be maintained in any court
17of competent jurisdiction by any
one or more employes
employe for and in behalf of
18that employe
or those employes and other employes similarly situated. No employe
19shall may be a party plaintiff to any such action unless the employe consents in
20writing to become such a party and the consent is filed in the court in which the action
21is brought.
The Notwithstanding s. 814.04 (1), the court shall, in addition to any
22judgment awarded to the plaintiff, allow
a reasonable
attorney's fee attorney fees 23and costs to be paid by the defendant.
AB632, s. 6
24Section
6. 66.293 (3) (b) of the statutes is repealed.
AB632, s. 7
25Section
7. 66.293 (3) (br) of the statutes is created to read:
AB632,12,13
166.293
(3) (br) In addition to the review under par. (bm), the local governmental
2unit that requested the wage determination under this subsection may request a
3review of any portion of a wage determination within 30 days after the determination
4date if the state agency submits evidence with the request showing that the
5prevailing wage rate or prevailing hours of labor for any given trade or occupation
6included in the determination does not represent the prevailing wage rate or
7prevailing hours of labor for that trade or occupation in the city, village or town in
8which the proposed project is located. That evidence shall include wage rate and
9hours of labor information for the contested trade or occupation on at least 3 similar
10projects located in the city, village or town in which the proposed project is located
11and on which some work has been performed within the previous 12 months. The
12department shall affirm or modify the original determination within 15 days after
13the date on which the department receives the request for review.
AB632, s. 8
14Section
8. 66.293 (3) (c) of the statutes is renumbered 66.293 (5) and amended
15to read:
AB632,13,1016
66.293
(5) (title)
Nonapplicability
. This
subsection section does not apply to
17any
highway, street or bridge construction or to any public works project
, including
18highway, street or bridge construction, to which 40 USC 276a applies or to any public
19works project involving more than one trade for which the estimated project cost of
20completion is below
$3,500 where a single trade is involved and $35,000 where more
21than one trade is involved on such project (after hearing these dollar amounts shall
22be adjusted by the department $150,000 or an amount determined by the
23department under this subsection. The department shall adjust that dollar amount 24every 2 years, the first adjustment to be made not sooner than January 1,
1976 2001.
25The adjustments shall be in proportion to any changes in construction costs since the
1effective date of the dollar amounts established under this subsection
immediately
2prior to each adjustment); nor does this subsection apply to wage rates and hours of
3employment of laborers, workmen or mechanics engaged in the processing or
4manufacture of materials or products or to the delivery thereof by or for commercial
5establishments which have a fixed place of business from which they regularly
6supply such processed or manufactured materials or products, except that this
7subsection does apply to laborers, workmen or mechanics delivering mineral
8aggregate such as sand, gravel or stone which is incorporated into the work under
9the contract by depositing the material substantially in place, directly or through
10spreaders, from the transporting vehicle.
AB632, s. 9
11Section
9. 66.293 (3) (cm) of the statutes is created to read:
AB632,13,1612
66.293
(3) (cm) The department shall withhold from inspection and copying
13under s. 19.35 (1) all personally identifiable information submitted to the
14department by contractors, subcontractors and agents thereof for the purpose of
15assisting the department in determining prevailing wage rates and prevailing hours
16of labor under this subsection.
AB632, s. 10
17Section
10. 66.293 (3) (d) of the statutes is renumbered 66.293 (6) and
18amended to read:
AB632,13,2519
66.293
(6) (title)
Exemptions. The department
of industry, labor and human
20relations, upon petition of any
municipality
local governmental unit, shall issue an
21order exempting the
municipality local governmental unit from applying to the
22department for a determination under
this subsection
sub. (3) when it is shown that
23an ordinance or other enactment of the
municipality
local governmental unit sets
24forth
the standards, policy, procedure and practice resulting in standards as high or
25higher than those under
s. 103.49 this section.
AB632, s. 11
1Section
11. 66.293 (3) (e) of the statutes is renumbered 66.293 (10) (a) and
2amended to read:
AB632,14,93
66.293
(10) (a) Each contractor, subcontractor or agent thereof
participating
4in performing work on a project
covered by this subsection that is subject to this
5section shall keep full and accurate records clearly indicating the name and trade or
6occupation of every
laborer, workman or mechanic employed by the contractor,
7subcontractor or agent in connection with the project person described in sub. (4) and
8an accurate record of the number of hours worked by each
employe of those persons 9and the actual wages paid therefor.
AB632, s. 12
10Section
12. 66.293 (3) (f) of the statutes is renumbered 66.293 (8) and amended
11to read:
AB632,14,1712
66.293
(8) (title)
Posting. For the information of the employes working on the
13project, the
prevailing wage rates and
prevailing hours
of labor determined by the
14department or exempted
municipality local governmental unit and the provisions of
15pars. (a) and (e) subs. (10) (a) and (11) (a) shall be kept posted by the
employer
local
16governmental unit in at least one conspicuous and easily accessible place at the site
17of the project.
AB632, s. 13
18Section
13. 66.293 (3) (g) of the statutes is renumbered 66.293 (9) (b) and
19amended to read:
AB632,14,2420
66.293
(9) (b)
Each Upon completion of a project and before final payment for
21completing a project, each agent or subcontractor shall furnish the contractor with
22evidence of compliance with an affidavit stating that the agent or subcontractor has
23complied fully with the requirements of this
subsection section. A contractor may
24not authorize final payment until that affidavit is filed in proper form and order.
AB632, s. 14
1Section
14. 66.293 (3) (h) of the statutes is renumbered 66.293 (9) (c) and
2amended to read:
AB632,15,173
66.293
(9) (c) Upon completion of
the
a project and
prior to before final payment
4therefor for completing a project, each contractor shall file with the
municipality 5local governmental unit an affidavit stating that the contractor has complied fully
6with the
provisions and requirements of this
subsection section and that the
7contractor has received
evidence an affidavit of compliance from each of the
8contractor's agents and subcontractors.
No municipality may A local governmental
9unit may not authorize
a final payment until such an affidavit is filed in proper form
10and order.
If a local governmental unit authorizes a final payment before such an
11affidavit is filed in proper form and order or if the department determines that any
12person specified in sub. (4) has been or may have been paid less than the prevailing
13wage rate or less than 1.5 times the hourly basic rate of pay for all hours worked in
14excess of the prevailing hours of labor and requests that the local governmental unit
15withhold all or part of the final payment, but the local governmental unit fails to do
16so, the local governmental unit is liable for all back wages payable up to the amount
17of that final payment.
AB632, s. 15
18Section
15. 66.293 (3) (i) of the statutes is renumbered 66.293 (10) (b) and
19amended to read:
AB632,16,420
66.293
(10) (b) The department
of industry, labor and human relations or the
21contracting
municipality local governmental unit may demand and examine
, and it
22shall be the duty of every contractor, subcontractor and agent thereof to furnish to
23the department and local governmental unit, copies of any payrolls and other records
24and information relating to the wages paid
laborers, workmen or mechanics on to
25persons described in sub. (4) for work to which this
subsection section applies. The
1department may inspect records in the manner provided in ch. 101. Every
2contractor, subcontractor or agent
performing work on a project that is subject to this
3section is subject to the requirements of ch. 101 relating to
the examination of
4records.
AB632, s. 16
5Section
16. 66.293 (3) (j) of the statutes is renumbered 66.293 (9) (a) and
6amended to read:
AB632,16,157
66.293
(9) (a) When the department
of industry, labor and human relations 8finds that a
municipality local governmental unit has not requested a prevailing
9wage rate determination or
that a local governmental unit, contractor or
10subcontractor has not
physically incorporated a prevailing wage rate determination
11into
the a contract
or subcontract as required under this
subsection
section, the
12department shall notify the
municipality local governmental unit, contractor or
13subcontractor of such noncompliance and shall file the prevailing wage rate
14determination with the
municipality local governmental unit, contractor or
15subcontractor within 30 days after such notice.
AB632, s. 17
16Section
17. 66.293 (3) (k) of the statutes is renumbered 66.293 (10) (d) and
17amended to read:
AB632,16,2118
66.293
(10) (d)
The provisions of s.
Section 101.02 (5) (f), (12), (13) and (14)
19apply applies to this
subsection section. Section 111.322 (2m) applies to discharge
20or other discriminatory acts arising in connection with any proceeding under this
21subsection section, including proceedings under
par. sub. (11) (a).
AB632, s. 18
22Section
18. 66.293 (3) (m) of the statutes is renumbered 66.293 (10) (c) and
23amended to read:
AB632,17,924
66.293
(10) (c) If requested by any person, the department shall inspect the
25payroll records of the contractors, subcontractors or agents
performing work on a
1project that is subject to this section to ensure compliance with this section.
The cost
2of the inspection shall be paid by the person making the request, if If the contractor,
3subcontractor
, or agent subject to the inspection is found to be in compliance
and if
4the person making the request is a person specified in sub. (4), the department shall
5charge the person making the request the actual cost of the inspection. If the
6contractor, subcontractor or agent subject to the inspection is found to be in
7compliance and if the person making the request is not a person specified in sub. (4),
8the department shall charge the person making the request $250 or the actual cost
9of the inspection, whichever is greater.
AB632, s. 19
10Section
19. 66.293 (3) (n) of the statutes is renumbered 66.293 (12) and
11amended to read:
AB632,18,412
66.293
(12) (title)
Debarment. (a) Except as provided under
subds. 2. and 3. 13pars. (b) and (c), the department
of industry, labor and human relations shall notify
14any
municipality local governmental unit applying for a determination under sub.
15(3)
(intro.) and any
municipality
local governmental unit exempted under
par. (d) 16sub. (6) of the names of all persons whom the department has found to have failed
17to pay the prevailing wage rate determined under
this subsection sub. (3) or has
18found to have paid less than 1.5 times the hourly basic rate of pay for
all hours worked
19on a project in excess of the prevailing hours of labor determined under
this
20subsection sub. (3) at any time in the preceding 3 years. The department shall
21include with any such name the address of such person and shall specify when
and
22how such person
has failed to pay the prevailing wage rate
determined under this
23subsection and when
and how such person
has failed to pay less than 1.5 times the
24hourly basic rate of pay for
all hours worked
on a project in excess of the prevailing
25hours of labor
determined under this subsection. No
municipality local
1governmental unit may award any contract to such person unless otherwise
2recommended by the department or unless at least 3 years have elapsed from the
3date the department issued its findings or the date of final determination by a court
4of competent jurisdiction, whichever is later.
AB632,18,105
(b) The department may not include in a notification under
subd. 1. par. (a) the
6name of any person on the basis of having let work to a person whom the department
7has found to have failed to pay the prevailing wage rate determined under
this
8subsection sub. (3) or has found to have paid less than 1.5 times the hourly basic rate
9of pay for
all hours worked
on a project in excess of the prevailing hours of labor
10determined under
this subsection sub. (3).
AB632,18,1411
(c) This
paragraph subsection does not apply to any contractor, subcontractor
12or agent who in good faith commits a minor violation of this section, as determined
13on a case-by-case basis through administrative hearings with all rights to due
14process afforded to all parties or who has not exhausted or waived all appeals.
AB632,18,2315
(d) Any person submitting a bid on a project
that is subject to this section shall
16be required, on the date the person submits the bid, to identify any construction
17business in which the person, or a shareholder, officer, partner or member of the
18person, if the person is a business, owns, or has owned at least a 25% interest on the
19date the person submits the bid or at any other time within 3 years preceding the date
20the person submits the bid, if the business has been found to have failed to pay the
21prevailing wage rate determined under
this subsection
sub. (3) or to have paid less
22than 1.5 times the hourly basic rate of pay for
all hours worked
on a project in excess
23of the prevailing hours of labor determined under
this subsection sub. (3).
AB632,18,2524
(e) The department shall promulgate rules to administer this
paragraph 25subsection.
AB632, s. 20
1Section
20. 66.293 (4) of the statutes is created to read:
AB632,19,62
66.293
(4) Covered employes. (a) All of the following employes shall be paid
3the prevailing wage rate determined under sub. (3) and may not be permitted to work
4a greater number of hours per calendar week than the prevailing hours of labor
5determined under sub. (3), unless they are paid for all hours worked in excess of the
6prevailing hours of labor at a rate of at least 1.5 times their hourly basic rate of pay:
AB632,19,147
1. All laborers, workers, mechanics and truck drivers employed on the site of
8a project that is subject to this section, or employed in delivering mineral aggregate
9such as sand, gravel or stone that is immediately incorporated into the work, and not
10stockpiled or further transported by truck, on the site of a project that is subject to
11this section by depositing the material substantially in place, directly or through
12spreaders, from the transporting vehicle, or employed in transporting excavated
13material or spoil from and returning to the site of a project that is subject to this
14section.
AB632,19,1915
2. All laborers, workers, mechanics and truck drivers employed in the
16manufacturing or furnishing of materials, articles, supplies or equipment on the site
17of a project that is subject to this section or from a facility dedicated exclusively, or
18nearly so, to the project by a contractor, subcontractor, agent or other person
19performing any work on the site of the project.
AB632,20,220
(b) Notwithstanding par. (a), a laborer, worker, mechanic or truck driver who
21is regularly employed in the processing, manufacturing or delivery of materials or
22products by or for a commercial establishment that has a fixed place of business from
23which the establishment regularly supplies processed or manufactured materials or
24products is not entitled to receive the prevailing wage rate determined under sub.
1(3) or to receive at least 1.5 times his or her hourly basic rate of pay for all hours
2worked in excess of the prevailing hours of labor determined under sub. (3).
AB632,20,73
(c) Notwithstanding par. (a), a person who volunteers to perform work on a
4project that is subject to this section is not entitled to receive the prevailing wage rate
5determined under sub. (3) or to receive at least 1.5 times his or her hourly basic rate
6of pay for all hours worked in excess of the prevailing hours of labor determined
7under sub. (3).
AB632, s. 21
8Section
21. 66.293 (5) of the statutes, as affected by 1995 Wisconsin Act ....
9(this act), is repealed and recreated to read:
AB632,20,1710
66.293
(5) Nonapplicability. This section does not apply to any public works
11project, including highway, street or bridge construction, to which
40 USC 276a 12applies or to any public works project involving more than one trade for which the
13estimated project cost of completion is below $200,000 or an amount determined by
14the department under this subsection. The department shall adjust that dollar
15amount every 2 years, the first adjustment to be made not sooner than January 1,
162001. The adjustments shall be in proportion to any changes in construction costs
17since the effective date of the dollar amounts established under this subsection.
AB632, s. 22
18Section
22. 66.293 (7) of the statutes is created to read:
AB632,21,319
66.293
(7) Hardship exception. If a local governmental unit believes that the
20payment of any prevailing wage rate determined under sub. (3) for a project that is
21subject to this section would pose a dire financial hardship for the local governmental
22unit, the local governmental unit may request the secretary to reduce that prevailing
23wage rate for that project. If the secretary determines that payment of that
24prevailing wage rate for the project would pose a dire financial hardship for the local
25governmental unit, the secretary may reduce that prevailing wage rate for the
1project by not more than 20%. A party aggrieved by a determination of the secretary
2under this subsection may request judicial review of that determination under s.
3227.52.
AB632, s. 23
4Section
23. 66.293 (9) (title) of the statutes is created to read:
AB632,21,55
66.293
(9) (title)
Compliance.
AB632, s. 24
6Section
24. 66.293 (10) (title) of the statutes is created to read:
AB632,21,77
66.293
(10) (title)
Records; inspection; enforcement.
AB632, s. 25
8Section
25. 66.293 (11) (title) of the statutes is created to read:
AB632,21,99
66.293
(11) (title)
Liability and penalties.
AB632, s. 26
10Section
26. 66.293 (11) (b) of the statutes is created to read:
AB632,21,1411
66.293
(11) (b) 1. Except as provided in subds. 2. and 4., any contractor,
12subcontractor or agent thereof who violates this section may be fined not more than
13$200 or imprisoned for not more than 6 months or both. Each day that any such
14violation continues shall be considered a separate offense.
AB632,21,2215
2. Whoever induces any individual who seeks to be or is employed on any
16project that is subject to this section to give up, waive or return any part of the wages
17to which the individual is entitled under the contract governing such project, or who
18reduces the hourly basic rate of pay normally paid to an employe for work on a project
19that is not subject to this section during a week in which the employe works both on
20a project that is subject to this section and on a project that is not subject to this
21section, by threat not to employ, by threat of dismissal from such employment or by
22any other means is guilty of an offense under s. 946.15 (1).
AB632,22,623
3. Any person employed on a project that is subject to this section who
24knowingly permits a contractor, subcontractor or agent thereof to pay him or her less
25than the prevailing wage rate set forth in the contract governing such project, who
1gives up, waives or returns any part of the compensation to which he or she is entitled
2under the contract, or who gives up, waives or returns any part of the compensation
3to which he or she is normally entitled for work on a project that is not subject to this
4section during a week in which the person works both on a project that is subject to
5this section and on a project that is not subject to this section, is guilty of an offense
6under s. 946.15 (2).
AB632,22,147
4. Whoever induces any individual who seeks to be or is employed on any
8project that is subject to this section to permit any part of the wages to which the
9individual is entitled under the contract governing such project to be deducted from
10the individual's pay and deposited with a labor organization for the purpose of
11subsidizing bids on other projects by threat not to employ or admit to labor
12organization membership, by threat of dismissal from such employment or labor
13organization membership or by any other means is guilty of an offense under s.
14946.15 (3).
AB632,22,1915
5. Any person employed on a project that is subject to this section who
16knowingly permits any part of the wages to which he or she is entitled under the
17contract governing such project to be deducted from his or her pay and deposited with
18a labor organization for the purpose of subsidizing bids on other projects is guilty of
19an offense under s. 946.15 (4).
AB632, s. 27
20Section
27. 103.49 (1) (title) of the statutes is created to read:
AB632,22,2121
103.49
(1) (title)
Definitions.
AB632, s. 28
22Section
28. 103.49 (1) (a) of the statutes is amended to read:
AB632,23,223
103.49
(1) (a) "Area" means the county
or other locality from which labor for
24any project would normally be secured in which a proposed project that is subject to
25this section is located and those counties that are contiguous to that county or, if the
1department modifies a wage determination under sub. (3) (c), "area" means the city,
2village or town in which a proposed project that is subject to this section is located.
AB632, s. 29
3Section
29. 103.49 (1) (b) of the statutes is amended to read:
AB632,23,74
103.49
(1) (b) "Hourly basic rate of pay" means the hourly wage paid to any
5employe, excluding any contributions or payments for health
and welfare insurance 6benefits, vacation benefits, pension benefits and any other
bona fide economic
7benefits, whether paid directly or indirectly.
AB632, s. 30
8Section
30. 103.49 (1) (c) of the statutes is renumbered 103.49 (1) (c) (intro.)
9and amended to read:
AB632,23,1510
103.49
(1) (c) (intro.) "Prevailing hours of labor"
in for any trade or occupation
11in any area means the hours of labor
per day and per week worked within the area
12by a larger number of workers than are employed in the trade or occupation for any
13other number of hours per
day or week. In no event shall the prevailing hours of labor
14be
deemed considered to be more than
8 hours per day nor more than 40 hours per
15week
. or to include any hours worked on a Sunday or on any of the following holidays:
AB632, s. 31
16Section
31. 103.49 (1) (c) 1. to 8. of the statutes are created to read:
AB632,23,1717
103.49
(1) (c) 1. January 1.
AB632,23,1818
2. The last Monday in May.
AB632,23,2020
4. The first Monday in September.
AB632,23,2121
5. The 4th Thursday in November.
AB632,23,2222
6. December 25.
AB632,23,2323
7. The day before if January 1, July 4 or December 25 falls on a Saturday.
AB632,23,2424
8. The day following if January 1, July 4 or December 25 falls on a Sunday.
AB632, s. 32
25Section
32. 103.49 (1) (d) of the statutes is amended to read:
AB632,24,22
1103.49
(1) (d) "Prevailing wage rate"
in for any trade or occupation in any area
2means the hourly basic rate
paid of pay, plus the hourly contribution for health
and
3welfare insurance benefits, vacation benefits, pension benefits and any other
bona
4fide economic benefit,
whether paid directly or indirectly
, to for a majority of
all
5persons employed the hours worked in the trade or occupation
in the area on the
6erection, construction, remodeling, repairing or demolition of any building in the
7area that is not subject to this section or on any other project, other than public
8highway or bridge construction or maintenance, in the area that is not subject to this
9section, or if there is no rate at which a majority
are employed of the hours worked
10in the trade or occupation on the erection, construction, remodeling, repairing or
11demolition of any building in the area that is not subject to this section or on any other
12project, other than public highway or bridge construction or maintenance, in the area
13that is not subject to this section is paid, then the prevailing wage rate shall be the
14rate which is paid to a larger number of employes than any other rate paid in the area
15for work in the trade or occupation average hourly basic rate of pay, weighted by the
16number of hours worked, plus the average hourly contribution, weighted by the
17number of hours worked, for health insurance benefits, vacation benefits, pension
18benefits and any other bona fide economic benefit, paid directly or indirectly to all
19persons employed in that trade or occupation on the erection, construction,
20remodeling, repairing or demolition of any building in that area that is not subject
21to this section or on any other project, other than public highway or bridge
22construction or maintenance, in that area that is not subject to this section.
AB632, s. 33
23Section
33. 103.49 (1) (e) of the statutes is created to read:
AB632,25,224
103.49
(1) (e) "State agency" means any office, department, independent
25agency, institution of higher education, association, society or other body in state
1government created or authorized to be created by the constitution or any law,
2including the legislature and the courts.
AB632, s. 34
3Section
34. 103.49 (1) (f) of the statutes is created to read:
AB632,25,44
103.49
(1) (f) "Truck driver" includes an owner-operator of a truck.