AB100-engrossed,582,1110 4. The percentage of the total number of submitted wildlife damage claims that
11are rejected for failure to meet the requirements of the program.
AB100-engrossed,582,1312 5. The percentage of the total number of wildlife damage claims for which the
13amount of the payment to the claimant was prorated under sub. (3) (e).
AB100-engrossed,582,1814 (b) Submission; distribution. 1. The department shall submit the report under
15this subsection no later than January 1 of each year for distribution to the
16appropriate standing committees of the legislature in the manner provided under s.
1713.172 (3). Except as provided in subd. 2., the report shall cover the 12-month period
18ending on the October 31 that immediately precedes the date of the report.
AB100-engrossed,582,2019 2. The report that is submitted before January 1, 1999, shall cover the
2010-month period ending on October 31, 1998.
AB100-engrossed, s. 1139s 21Section 1139s. 29.60 (2g) of the statutes is created to read:
AB100-engrossed,582,2422 29.60 (2g) (a) Subsections (1) and (2) do not apply to toxicants placed in the
23waters of a self-contained fish rearing facility or a state or municipal fish hatchery
24if the toxicants are necessary to the operation of the fish farm or fish hatchery.
AB100-engrossed,583,4
1(b) Subsections (1) and (2) do not apply to toxicants placed in the waters of a
2preexisting fish rearing facility that is an artificial body of water if the toxicants are
3necessary to the operation of the fish farm and the department has issued a permit
4under s. 283.31 for the preexisting fish rearing facility.
AB100-engrossed, s. 1139tm 5Section 1139tm. 29.62 (1) of the statutes is amended to read:
AB100-engrossed,583,96 29.62 (1) The department may take rough fish by means of seines, nets or other
7devices, or cause rough fish to be taken, from any of the waters of this state, other
8than waters in a self-contained fish rearing facility or in a preexisting fish rearing
9facility that is barrier equipped and that is an artificial body of water
.
AB100-engrossed, s. 1139um 10Section 1139um. 29.623 of the statutes is renumbered 29.623 (1).
AB100-engrossed, s. 1139ur 11Section 1139ur. 29.623 (2) of the statutes is created to read:
AB100-engrossed,583,1412 29.623 (2) Subsection (1) does not authorize the department to remove fish
13from a self-contained fish rearing facility or from a preexisting fish rearing facility
14that is an artificial body of water unless one or more of the following apply:
AB100-engrossed,583,1815 (a) The fish are of a species that is not native to this state and the department
16determines that having the fish in that particular self-contained fish rearing facility
17or preexisting fish rearing facility poses a risk of being detrimental to the waters of
18the state.
AB100-engrossed,583,2119 (b) The department of agriculture, trade and consumer protection has
20requested that the department of natural resources remove the fish to address a
21problem affecting fish health.
AB100-engrossed, s. 1139v 22Section 1139v. 29.645 of the statutes is amended to read:
AB100-engrossed,584,2 2329.645 Larceny of game. A person who, without permission of the owner,
24molests, disturbs or appropriates any wild animal or its carcass that has been

1lawfully reduced to possession by another shall forfeit not less than $1,000 nor more
2than $2,000. This section does not apply to farm-raised deer or farm-raised fish.
AB100-engrossed, s. 1139vv 3Section 1139vv. 29.65 (1) (intro.) of the statutes is amended to read:
AB100-engrossed,584,94 29.65 (1) (intro.) The department may bring a civil action in the name of the
5state for the recovery of damages against any person unlawfully killing, wounding,
6catching, taking, trapping, or having unlawfully in possession or possessing in
7violation of this chapter
any of the following named protected wild animals, birds,
8or fish, or any part of an animal, bird or fish, and the sum assessed for damages for
9each wild animal, bird, or fish shall be not less than the amount stated in this section:
AB100-engrossed, s. 1139w 10Section 1139w. 29.99 (15) of the statutes is amended to read:
AB100-engrossed,584,1811 29.99 (15) In any prosecution under this section it is not necessary for the state
12to allege or prove that the animals were not farm-raised deer, farm-raised fish or
13domesticated animals;, that they were not taken for scientific purposes, or that they
14were taken or in possession or under control without a required approval. The person
15claiming that these animals were farm-raised deer, farm-raised fish or
16domesticated animals, that they were taken for scientific purposes or that they were
17taken or in possession or under control under the required approval, has the burden
18of proving these facts.
AB100-engrossed, s. 1139w 19Section 1139w. 30.12 (4) (bn) of the statutes is created to read:
AB100-engrossed,584,2420 30.12 (4) (bn) Any interdepartmental liaison procedures established under par.
21(b) that relate to mitigation of wetland loss may not regulate or give priority to sites
22for the wetlands to be created or restored based solely on proximity of the sites to the
23wetlands to be lost except that the procedures may give priority to sites that are in
24the same watersheds or aquifers as are the wetlands to be lost.
AB100-engrossed, s. 1139x
1Section 1139x. 30.1255 (1) (intro.) and (a) of the statutes are consolidated,
2renumbered 30.1255 (1) and amended to read:
AB100-engrossed,585,73 30.1255 (1) (title) Definitions Definition. In this section: (a) "Aquatic,
4"aquatic
nuisance species" means a nonindigenous species that threatens the
5diversity or abundance of native species or the ecological stability of infested waters
6or that threatens a commercial, agricultural, aquacultural or recreational activity
7dependent on infested waters.
AB100-engrossed, s. 1139y 8Section 1139y. 30.1255 (1) (b) of the statutes is repealed.
AB100-engrossed, s. 1139z 9Section 1139z. 30.1255 (2) of the statutes is repealed.
AB100-engrossed, s. 1139zb 10Section 1139zb. 30.1255 (3) (a) (intro.) of the statutes is amended to read:
AB100-engrossed,585,1211 30.1255 (3) (a) (intro.) After consulting with the council, the The department
12shall submit periodically to the legislature reports describing all of the following:
AB100-engrossed, s. 1139zm 13Section 1139zm. 30.135 of the statutes is created to read:
AB100-engrossed,585,17 1430.135 Regulation of water ski platforms and jumps. (1) When permit
15required.
(a) A riparian proprietor may place a water ski platform or water ski jump
16in a navigable waterway without obtaining a permit if all of the following
17requirements are met:
AB100-engrossed,585,1918 1. The platform or jump does not interfere with public rights in navigable
19waters.
AB100-engrossed,585,2120 2. The platform or jump does not interfere with rights of other riparian
21proprietors.
AB100-engrossed,585,2322 3. The platform or jump is located at a site that ensures adequate water depth
23and clearance for safe water skiing.
AB100-engrossed,585,2524 (b) If the department determines that any of the requirements under par. (a)
25are not met, the riparian owner shall submit a permit application to the department.
AB100-engrossed,586,11
1(2) Notice and hearing procedure. (a) Upon receipt of a complete permit
2application, the department shall either order a hearing or provide notice stating
3that it will proceed on the application without a hearing unless a substantive written
4objection to issuance of the permit is received within 30 days after publication of the
5notice. The department shall provide a copy of the notice to the applicant for the
6permit, the clerk of each municipality in which the water ski platform or water ski
7jump is to be located and to any other person required by law to receive notice. The
8department may provide notice to other persons as it considers appropriate. The
9applicant shall publish the notice as a class 1 notice under ch. 985 in a newspaper
10designated by the department that is likely to give notice in the area affected. The
11applicant shall file proof of publication with the department.
AB100-engrossed,586,1512 (b) If the department receives no substantive written objection to the permit
13and proceeds on the permit application without a hearing, the department shall
14approve or disapprove the permit within 5 days after the date that the 30-day period
15under par. (a) expires.
AB100-engrossed,586,2516 (c) If the department orders a hearing on the permit application, the hearing
17shall be scheduled within 30 days after the date on which the department orders the
18hearing. The division of hearings and appeals shall mail copies of the written notice
19of the hearing at least 10 days before the hearing to each person provided the notice
20under par. (a). The division of hearings and appeals shall mail the copies at least 10
21days before the hearing except that it shall mail the copy to the applicant for the
22permit at least 20 days before the hearing. The applicant shall publish the notice as
23a class 1 notice under ch. 985 in a newspaper designated by the department that is
24likely to give notice in the area affected. The applicant shall file proof of the
25publication with the hearing examiner at or prior to the hearing.
AB100-engrossed,587,3
1(3) Rules. (a) The department shall promulgate a rule listing specific reasons
2that will support a substantive written objection to the placement of a water ski
3platform or water ski jump.
AB100-engrossed,587,64 (b) The department shall promulgate rules specifying the information that
5shall be disclosed in an notice under sub. (2) (a). The disclosed information shall
6include all of the following:
AB100-engrossed,587,97 1. A statement explaining what constitutes a substantive written objection and
8the list of specific reasons that support a substantive written objection that is
9promulgated under par. (a).
AB100-engrossed,587,1110 2. The fact that the department may decide to proceed on the application
11without a hearing.
AB100-engrossed,587,1312 3. The fact that a decision to proceed on an application without a hearing under
13subd. 2. is subject to review under ch. 227.
AB100-engrossed,587,15 14(4) Exemption. Section 30.02 does not apply to permit applications submitted
15under this section.
AB100-engrossed, s. 1140 16Section 1140. 30.277 (3) (k) of the statutes is created to read:
AB100-engrossed,587,1817 30.277 (3) (k) Whether the project is related to brownfields redevelopment, as
18defined in s. 23.09 (19) (a) 1.
AB100-engrossed, s. 1141 19Section 1141. 30.277 (6) of the statutes is amended to read:
AB100-engrossed,587,2520 30.277 (6) Rules. The department shall promulgate rules for the
21administration of this section, including rules that specify the weight to be assigned
22to each criterion under sub. (3) and the minimum number of criteria under sub. (3)
23in which an applicant must perform satisfactorily in order to be awarded a grant.
24In specifying the weight to be assigned to the criteria under sub. (3), the department
25shall assign the greatest weight to the criterion under sub. (3) (k).
AB100-engrossed, s. 1139x
1Section 1139x. 30.28 (2) (c) of the statutes is repealed.
AB100-engrossed, s. 1141m 2Section 1141m. 30.28 (2m) (a) of the statutes is amended to read:
AB100-engrossed,588,73 30.28 (2m) (a) The department shall refund a permit or approval fee if the
4applicant requests a refund before the department determines that the application
5for the permit or approval is complete. The Except as provided under s. 299.05, the
6department may not refund a permit or approval fee after the department
7determines that the application is complete.
AB100-engrossed, s. 1142 8Section 1142. 30.28 (2r) of the statutes is created to read:
AB100-engrossed,588,119 30.28 (2r) Fee for expedited service. The department, by rule, may charge a
10supplemental fee for a permit or approval that is in addition to the fee charged under
11this section if all of the following apply:
AB100-engrossed,588,1412 (a) The applicant requests in writing that the permit or approval be issued
13within a time period that is shorter than the time limit under the rule promulgated
14under s. 299.05 for that type of permit or approval.
AB100-engrossed,588,1515 (b) The department verifies that it will be able to comply with the request.
AB100-engrossed, s. 1142m 16Section 1142m. 30.45 (7) (b) of the statutes is amended to read:
AB100-engrossed,588,1817 30.45 (7) (b) A sign erected by the state or municipality in charge of a highway,
18or by a person authorized under s. 86.19 (7)
.
AB100-engrossed, s. 1143 19Section 1143. 30.52 (3m) (b) of the statutes is amended to read:
AB100-engrossed,588,2120 30.52 (3m) (b) All moneys collected under par. (a) shall be deposited into the
21account under s. 20.370 (1) (is) (3) (is).
AB100-engrossed, s. 1144 22Section 1144. 30.541 (3) (d) 2. d. of the statutes is amended to read:
AB100-engrossed,589,223 30.541 (3) (d) 2. d. The limit in subd. 2. c. does not apply if the surviving spouse
24proceeds under s. 867.03 (1) (1g) and the total value of the decedent's solely owned

1property in the state, including boats transferred under this subdivision, does not
2exceed $10,000.
AB100-engrossed, s. 1144p 3Section 1144p. 30.92 (1) (b) of the statutes is amended to read:
AB100-engrossed,589,94 30.92 (1) (b) "Governmental unit" means the department, a municipality, a lake
5sanitary district, a public inland lake protection and rehabilitation district organized
6under ch. 33, the Milwaukee River revitalization council, the Lower Wisconsin State
7Riverway board, the Fox River management commission or any other local
8governmental unit, as defined in s. 66.299 (1) (a), that is established for the purpose
9of lake management.
AB100-engrossed, s. 1144q 10Section 1144q. 30.92 (4) (b) 2. of the statutes is amended to read:
AB100-engrossed,589,1611 30.92 (4) (b) 2. a. The department may cost-share, with the approval of the
12commission, with a qualified lake association or an affected governmental unit,
13including itself, at a rate of up to 50% of any construction, acquisition, rehabilitation,
14feasibility study or other project costs or any combination of these costs, for the
15recreational boating project if the costs are the type that qualify for funding under
16this section.
AB100-engrossed,589,19 17c. The department may pay, with the approval of the commission, an additional
1810% of the costs of a construction project if the municipality conducts a boating safety
19enforcement and education program approved by the department.
AB100-engrossed, s. 1144r 20Section 1144r. 30.92 (4) (b) 2. b. of the statutes is created to read:
AB100-engrossed,589,2421 30.92 (4) (b) 2. b. The department, with the approval of the commission, may
22increase the maximum cost-share rate under subd. 2. a. from 50% to 80% if the
23commission determines that the recreational boating project is a project of statewide
24or regional significance.
AB100-engrossed, s. 1144s 25Section 1144s. 30.92 (4) (b) 2m. of the statutes is created to read:
AB100-engrossed,590,3
130.92 (4) (b) 2m. The qualified lake association or governmental unit that
2cost-shares under subd. 2. may make its contribution in matching funds or in-kind
3contributions or both.
AB100-engrossed, s. 1145 4Section 1145. 30.92 (4) (b) 8. bn. of the statutes is created to read:
AB100-engrossed,590,65 30.92 (4) (b) 8. bn. Acquisition of capital equipment that is necessary to collect
6and remove floating trash and debris from a waterway.
AB100-engrossed, s. 1146 7Section 1146. 30.92 (4m) of the statutes is created to read:
AB100-engrossed,590,188 30.92 (4m) Lake Superior harbor of refuge. The department, with the
9approval of the commission, may expend an amount to pay up to 100% of the eligible
10costs for the construction of a harbor of refuge along the Lake Superior shoreline.
11Notwithstanding sub. (4) (b) 4., the project costs may include the acquisition of land.
12Notwithstanding sub. (4) (a), the department may expend directly the amount
13authorized under this subsection even though Lake Superior is not an inland lake
14without a public access facility. Notwithstanding sub. (4) (b) 2., the department need
15not contribute any moneys to match the amount expended from the appropriation
16under s. 20.370 (5) (cq). The amount expended under this subsection shall be
17considered an expenditure for a Great Lakes project. This project need not be placed
18on the priority list under sub. (3) (a).
AB100-engrossed, s. 1146d 19Section 1146d. 30.92 (4t) of the statutes is created to read:
AB100-engrossed,591,4 2030.92 (4t) Linnie Lac Dam. Of the amounts appropriated under s. 20.370 (5)
21(cq) and before applying the percentages under sub. (4) (b) 6., the department
22shallprovide to the city of New Berlin the amount that is necessary for the repair,
23removal or reconstruction of the Linnie Lac Dam, but the amount shall not exceed
24$250,000. The city of New Berlin need not assume ownership of the Linnie Lac Dam
25and, notwithstanding sub. (4) (b) 2., the city of New Berlin need not contribute any

1moneys to match the amount expended from the appropriation under s. 20.370 (5)
2(cq). Notwithstanding sub. (1) (c), the dam project specified under this subsection is
3a recreational boating facility for the purpose of expending moneys under this
4section. This project need not be placed on the priority list under sub. (3) (a).
AB100-engrossed, s. 1146g 5Section 1146g. 30.92 (5) of the statutes is renumbered 30.92 (5) (a).
AB100-engrossed, s. 1146h 6Section 1146h. 30.92 (5) (b) of the statutes is created to read:
AB100-engrossed,591,97 30.92 (5) (b) For purposes of sub. (4) (b) 2. b., the department shall promulgate
8rules to be used to determine whether a recreational boating project is a recreational
9boating project of statewide or regional significance.
AB100-engrossed, s. 1147 10Section 1147. 30.94 (6m) of the statutes is amended to read:
AB100-engrossed,591,1611 30.94 (6m) State aid. Notwithstanding s. 30.92 (4) (a), the department shall
12provide in each fiscal year funds from the appropriation under s. 20.370 (5) (hu) (9)
13(ju)
to the commission for the management, operation, restoration and repair of the
14Fox River navigational system if Brown County, Calumet County, Fond du Lac
15County, Outagamie County and Winnebago County contribute matching funds for
16the management and operation of the Fox River navigational system.
AB100-engrossed, s. 1147f 17Section 1147f. 31.385 (2) (ag) of the statutes is created to read:
AB100-engrossed,591,2118 31.385 (2) (ag) Of the amounts appropriated under s. 20.866 (2) (tL), at least
19$250,000 shall be used for projects to remove dams that are less than 15 feet wide
20and that create impoundments of 50 acre-feet of water or less. A project under this
21paragraph may include restoring the stream or river that was dammed.
AB100-engrossed, s. 1147g 22Section 1147g. 31.385 (2) (ar) of the statutes is created to read:
AB100-engrossed,591,2423 31.385 (2) (ar) Of the amounts appropriated under s. 20.866 (2) (tL), at least
24$100,000 shall be used for the removal of abandoned dams.
AB100-engrossed, s. 1148 25Section 1148. 31.39 (2r) of the statutes is created to read:
AB100-engrossed,592,3
131.39 (2r) Fee for expedited service. (a) The department, by rule, may charge
2a supplemental fee for a permit or approval that is in addition to the fee charged
3under this section if all of the following apply:
AB100-engrossed,592,64 1. The applicant requests in writing that the permit or approval be issued
5within a time period that is shorter than the time limit promulgated under par. (b)
6for that type of permit or approval.
AB100-engrossed,592,77 2. The department verifies that it will be able to comply with the request.
AB100-engrossed,592,108 (b) If the department promulgates a rule under par. (a), the rule shall contain
9a time limit for each type of permit or approval classified under sub. (2) (a) for
10determining whether the department will grant the permit or approval.
Loading...
Loading...