SB534,40,1713 b. "Reliability council area" means the geographic area that, on December 31,
141997, was served by the Mid-America Interconnected Network, Inc., Mid-Continent
15Area Power Pool, East Central Area Reliability Coordination Agreement or
16Southwest Power Pool reliability council of the North American Electric Reliability
17Council.
SB534,40,2218 c. "Wholesale merchant plant" means electric generating equipment and
19associated facilities that are located in the reliability council area and that do not
20provide retail service to customers in this state, but does not include any equipment
21or facilities that were subject to regulation as public utility assets under the laws of
22this or another state on December 31, 1997.
SB534,40,2523 2. The assets of an eligible wholesale merchant plant shall not be included in
24the sum of the assets of a public utility affiliate under par. (p) 1. a., b. or c. and shall
25not be included in a nonutility affiliate's total assets under par. (p) 2. a.
SB534,41,3
13. The assets of a foreign affiliate shall be included in the sum of the assets of
2a public utility affiliate under par. (p) 1. a., b. or c. and shall not be included in a
3nonutility affiliate's total assets under par. (p) 2. a.
SB534, s. 94 4Section 94. 196.795 (7) (a) 1. b. of the statutes is amended to read:
SB534,41,75 196.795 (7) (a) 1. b. Any public utility or member of a cooperative association
6organized under ch. 185 which files or has filed a plan under reports or has reported
7information to the commission under the rules promulgated under
s. 196.491 (2) (ag).
SB534, s. 94m 8Section 94m. 196.795 (11) (b) of the statutes is amended to read:
SB534,41,199 196.795 (11) (b) This section shall be deemed to legalize and confirm the
10formation, prior to November 28, 1985, of any holding company, which is not itself
11a public utility, and shall be deemed to legalize and confirm the operations and
12issuances of securities of the holding company, except that nothing in this section
13shall be deemed to prevent the commission from imposing reasonable terms,
14limitations or conditions on any holding company which are consistent with the
15requirements of sub. (5) (pm) or
which are consistent with and necessary to satisfy
16the requirements of sub. (5) (b) to (o) and (q) to (s) or which relate to future
17investments by the holding company unless the holding company owns, operates,
18manages or controls a telecommunications utility and does not also own, operate,
19manage or control a public utility which is not a telecommunications utility.
SB534, s. 95 20Section 95. 289.29 (5) of the statutes is amended to read:
SB534,42,221 289.29 (5) Issuance of final determination of feasibility in certain
22situations involving utilities and mining.
If a determination of feasibility is
23required under s. 196.491 (2m) identified in the listing specified in s. 196.491 (3) (a)
243. a.
, the issuance of a final determination of feasibility is subject to the time limits
25limit under s. 196.491 (3) (f) and (ff) (a) 3. b. If a determination of feasibility is

1required under s. 293.43, the issuance of a final determination of feasibility is subject
2to the time limits under s. 293.45 (2) or 293.49, whichever is applicable.
SB534, s. 96 3Section 96. Nonstatutory provisions.
SB534,42,44 (1) Requests for proposals for electric generation capacity.
SB534,42,55 (a) In this subsection:
SB534,42,8 61. "Certificate" means a certificate issued by the commission under section
7196.49 of the statutes or under section 196.491 (3) of the statutes, as affected by this
8act.
SB534,42,9 92. "Commission" means the public service commission.
SB534,42,12 103. "Contractor" means a person specified in paragraph (b) 3. that enters into
11a contract with an eastern Wisconsin utility for the construction of electric
12generation capacity.
SB534,42,13 134. "Department" means the department of natural resources.
SB534,42,15 145. "Eastern Wisconsin utility" has the meaning given in section 196.377 (2) (a)
151. of the statutes, as created by this act.
SB534,42,17 166. "Reliability council" has the meaning given in section 196.377 (2) (a) 4. of the
17statutes, as created by this act.
SB534,42,2118 (b) By July 31, 1998, or a later date approved by the commission, each eastern
19Wisconsin utility that, before the effective date of this paragraph, has issued a
20request for proposals soliciting bids for contracts for the construction of new electric
21generation capacity shall do each of the following:
SB534,42,23 221. Complete its evaluation of the bids that were submitted in response to the
23request for proposals.
SB534,42,24 242. Select the bids for which it intends to award the contracts.
SB534,43,2
13. Enter into contracts with the persons who submitted the bids specified in
2subdivision 2. for the construction of the new electric generation capacity.
SB534,43,103 (c) Notwithstanding section 196.491 (3) (a) 1. of the statutes, as affected by this
4act, no later than August 31, 1998, each eastern Wisconsin utility specified in
5paragraph (b) (intro.) shall apply to the commission for any certificate that is
6required for construction of new electric generation capacity under the contracts into
7which it enters under paragraph (b) 3. and, if required under section 196.491 (3) (a)
83. a. of the statutes, as affected by this act, submit an engineering plan to the
9department as specified in section 196.491 (3) (a) 3. a. of the statutes, as affected by
10this act.
SB534,43,1411 (d) Notwithstanding section 196.491 (3) (a) 3. a. and b. of the statutes, as
12affected by this act, if an eastern Wisconsin utility specified in paragraph (b) (intro.)
13submits an engineering plan to the department under paragraph (c), the eastern
14Wisconsin utility and the department shall satisfy each of the following:
SB534,43,19 151. Within 15 days after the eastern Wisconsin utility provides the engineering
16plan, the department shall provide the eastern Wisconsin utility with a listing of
17each department permit or approval which, on the basis of the information contained
18in the engineering plan, appears to be required for the construction or operation of
19the facility.
SB534,43,22 202. Within 10 days after the department provides a listing specified in
21subdivision 1., the eastern Wisconsin utility shall apply for the permits and
22approvals identified in the listing.
SB534,44,6 233. The department shall determine whether an application under subdivision
242. is complete and, no later than 15 days after the application is filed, notify the
25applicant about the determination. If the department determines that the

1application is incomplete, the notice shall state the reason for the determination. An
2eastern Wisconsin utility may supplement and refile an application that the
3department has determined to be incomplete. There is no limit on the number of
4times that an applicant may refile an application under this subdivision. If the
5department fails to determine whether an application is complete within 15 days
6after the application is filed, the application shall be considered to be complete.
SB534,44,9 74. The department shall complete action on an application submitted under
8subdivision 2. or refiled under subdivision 3. within 45 days after the date on which
9the application is determined or considered to be complete under subdivision 3.
SB534,44,1310 (e) Notwithstanding section 196.491 (3) (a) 2., (b) and (g) 1. and 2. of the
11statutes, as affected by this act, the commission and an eastern Wisconsin utility
12specified in paragraph (b) (intro.) that applies for a certificate under section 196.491
13(3) of the statutes, as affected by this act, shall satisfy each of the following:
SB534,44,22 141. The commission shall determine whether the application is complete and,
15no later than 15 days after the application is filed, notify the applicant about the
16determination. If the commission determines that the application is incomplete, the
17notice shall state the reason for the determination. An eastern Wisconsin utility may
18supplement and refile an application that the commission has determined to be
19incomplete. There is no limit on the number of times that an eastern Wisconsin
20utility may refile an application under this subdivision. If the commission fails to
21determine whether an application is complete within 15 days after the application
22is filed, the application shall be considered to be complete.
SB534,45,2 232. The commission shall hold a public hearing on an application that is
24determined or considered to be complete under subdivision 1. in the area affected

1pursuant to section 227.44 of the statutes and, at least 15 days prior to the hearing,
2shall give a class 1 notice regarding the hearing under chapter 985 of the statutes.
SB534,45,6 33. The commission shall take final action on the application within 90 days
4after the application is determined or considered to be complete under subdivision
51. If the commission fails to take final action within the 90-day period, the
6commission is considered to have issued a certificate with respect to the application.
SB534,45,77 (2) Submission of proposed rules.
SB534,45,118 (a) The public service commission shall submit in proposed form the rules
9required under section 196.03 (5m) of the statutes, as created by this act, to the
10legislative council staff under section 227.15 (1) of the statutes no later than the first
11day of the 6th month beginning after the effective date of this paragraph.
SB534,45,1512 (b) The public service commission shall submit in proposed form the rules
13required under section 196.491 (3m) (b) of the statutes, as created by this act, to the
14legislative council staff under section 227.15 (1) of the statutes no later than the first
15day of the 6th month beginning after the effective date of this paragraph.
SB534,45,1616 (3) Exemption from emergency rule procedures.
SB534,45,2417 (a) Using the procedure under section 227.24 of the statutes, the public service
18commission may promulgate rules required under section 196.03 (5m) of the
19statutes, as created by this act, for the period before the effective date of permanent
20rules promulgated under section 196.491 (3m) (b) of the statutes, as created by this
21act, but not to exceed the period authorized under section 227.24 (1) (c) and (2) of the
22statutes. Notwithstanding section 227.24 (1) (a) and (2) (b) of the statutes, the public
23service commission need not provide evidence of the necessity of preservation of the
24public peace, health, safety or welfare in promulgating rules under this paragraph.
SB534,46,8
1(b) Using the procedure under section 227.24 of the statutes, the public service
2commission may promulgate rules required under section 196.491 (3m) (b) of the
3statutes, as created by this act, for the period before the effective date of permanent
4rules promulgated under section 196.491 (3m) (b) of the statutes, as created by this
5act, but not to exceed the period authorized under section 227.24 (1) (c) and (2) of the
6statutes. Notwithstanding section 227.24 (1) (a) and (2) (b) of the statutes, the public
7service commission need not provide evidence of the necessity of preservation of the
8public peace, health, safety or welfare in promulgating rules under this paragraph.
SB534, s. 97 9Section 97. Initial applicability.
SB534,46,1210 (1) The treatment of section 30.025 (1) and (4) of the statutes first applies to
11engineering plans submitted in lieu of separate permit applications on the effective
12date of this subsection.
SB534,46,1513 (2) The treatment of sections 30.44 (3m) (a), (b) and (d), 30.45 (1r), 86.16 (1) and
14182.017 (1) of the statutes first applies to applications for permits that are filed on
15the effective date of this subsection.
SB534,46,1916 (3) The treatment of sections 32.02 (5) (a), 32.06 (7) and 32.09 (2m) of the
17statutes and the renumbering and amendment of section 32.02 (5) of the statutes
18first apply to petitions for condemnation proceedings that are filed on the effective
19date of this subsection.
SB534,46,2120 (4) The treatment of section 196.24 (3) of the statutes first applies to records
21of cases that are read or reviewed on the effective date of this subsection.
SB534,46,2422 (5) The treatment of section 196.39 (2) of the statutes and the renumbering and
23amendment of section 196.39 of the statutes first apply to orders issued and cases
24initiated on the effective date of this subsection.
SB534,47,6
1(6) The treatment of sections 196.491 (1) (a), (am), (bm), (d), (e), (g) and (w),
2(2m), (3) (a) 2. and 3. b., (b), (d) (intro.), 1., 2., 3. and 7., (dm), (e), (f), (ff), (g) (intro.),
31., 1m. and 2., (hm), (j) and (k) and (4) (a) (intro.), 1., 2. and 3., (b) and (c) and 196.493
4(1) and (2) (intro.) of the statutes and the renumbering and amendment of section
5196.491 (3) (a) of the statutes first apply to applications for certificates of public
6convenience and necessity that are filed on the effective date of this subsection.
SB534,47,87 (7) The treatment of section 289.29 (5) of the statutes first applies to feasibility
8reports that are submitted on the effective date of this subsection.
SB534, s. 98 9Section 98. Effective date.
SB534,47,1010 (1) This act takes effect on September 1, 1998.
SB534,47,1111 (End)
Loading...
Loading...