Local roads improvement program: allocations increased for nonentitlement component -
OC7 SB2
Local roads improvement program: discretionary grant increases [Sec. 2555-2557] -
SB40
Modular home permits re transporting on highways: permit may apply to more than one section of the same home; indivisible load requirement exception -
AB819
Modular home permits re transporting on highways: permit may apply to more than one section of the same home; indivisible load requirement exception -
SB502
Neighborhood electric vehicle revisions re registration, operation on roadways, ordinances, certificate of title, and exemption from emission inspections -
AB339
Neighborhood electric vehicle revisions re registration, operation on roadways, ordinances, certificate of title, and exemption from emission inspections [S.Amdt.1: definition revised] -
SB186
Permits for activities along an STH: municipal authority to approve; condition set [Enrolled SB-40: Sec. 2523m, 2534p, r, 2550s, t, 2558d] -
SB40
Three-vehicle combinations operated on certain highways without permit: 2005 WisAct 363 correction (remedial legislation) -
SB368
Vehicle or vehicle combination operating under a Michigan border permit: allowing transport of wood chips or forestry biomass and operation on certain portion of USH 2 in Bayfield County -
AB414
Vehicle or vehicle combination operating under a Michigan border permit: allowing transport of wood chips or forestry biomass and operation on certain portion of USH 2 in Bayfield County [S.Sub.Amdt.1; deleted by Conf.Sub.Amdt.1]
-
SB40
Vehicle or vehicle combination operating under a Michigan border permit: allowing transport of wood chips or forestry biomass and operation on certain portion of USH 2 in Bayfield County -
SB209
Business Hwy 51 widening project in Village of Rothschild: transportation economic assistance grant, local match required [Enrolled SB-40: Sec. 309c, 9148 (9i)]
-
SB40
County transportation aid payment delay and state highway maintenance funding [Conf.Sub.Amdt.1]
-
MR8 AB1
CTH H on Madeline Island: grant from local transportation facility improvement assistance [Enrolled SB-40: Sec. 9148 (9cc)] -
SB40
DNR water quality certification process and approvals re wetlands: exemption for specific road construction near the City of Tomahawk -
AB163
DOT general obligation bonding increased re Marquette interchange reconstruction project; use of proceeds to fund I94 north-south corridor reconstruction authorized [Sec. 314, 593, 2536; Enrolled SB-40: further revisions, 314b, deletes 314] -
SB40
Environmental review of local transportation projects: funds for additional positions [Enrolled SB-40: Sec. 306m, 2557m]
-
SB40
Highway improvement project exceeding certain amount: DOT required to employ value engineering, report required [Enrolled SB-40: Sec. 2524p, 2531c, e, 9348 (11f), 9448 (11f)]
-
SB40
Highway improvement project that exceeds certain amount or meets certain DOT criteria: DOT required to employ value engineering; definition, exception, and report provisions -
AB134
Highway projects and state highway rehabilitation: general obligation bond debt service appropriation [Sec. 310, 315] -
SB40
I 43 pavement rehabilitation project in Rock County [Enrolled SB-40: Sec. 9148 (6j)] -
SB40
Kenosha, City of, street improvements: grant from local transportation facility improvement assistance [Enrolled SB-40: Sec. 9148 (12z)] -
SB40
Local roads improvement program grants: state veterans cemetery access road in Washburn County, 85th Street in Village of Pleasant Prairie, and McComb Avenue in Village of Rib Lake [Enrolled SB-40: Sec. 307, 9148 (3), (9z), (14qq)]
-
SB40
Major highway projects, southeast Wisconsin freeway rehabilitation projects, and state highway rehabilitation projects: additional public debt authorized -
MR8 AB1
Major highway projects, southeast Wisconsin freeway rehabilitation projects, and state highway rehabilitation projects: appropriation decreased; DOA and DOT secretaries duties; 2009-11 biennial budget request provision
-
MR8 AB1
Pound, Town of: road improvement grant from the transportation economic assistance program [Enrolled SB-40: Sec. 9148 (11x)] -
SB40
Prevailing wage revision re truck drivers delivering mineral aggregate to state highway projects or state or municipal construction projects [A.Sub.Amdt.1 or A.Amdt.1; deleted by Conf.Sub.Amdt.1] -
SB40
Reroute certain state highways through the City of Ripon: DOT study and report required [Enrolled SB-40: Sec. 9148 (4m)] -
SB40
Snowplow attached to ATV: operation on roadway or highway permitted; revolving yellow light required
-
SB443
Southeast Wisconsin freeway rehabilitation: I 94 north-south corridor project enumerated and general obligation bonding limit increased -
OC7 SB2
Southeast Wisconsin freeway rehabilitation project: additional lane of traffic on I 94 near Wood National Cemetery prohibited [Enrolled SB-40: Sec. 2528d] -
SB40
Southeast Wisconsin freeway rehabilitation: two projects enumerated [Sec. 2525-2528] -
SB40
State trunk and connecting highways development or improvement: JCF to lapse to transportation fund amount requested by DOT for fiscal year 2006-07 [Sec. 9248 (1)]
-
AB72
State trunk and connecting highways development or improvement: JCF to lapse to transportation fund amount requested by DOT for fiscal year 2006-07 [Sec. 9248 (1); S.Sub.Amdt.1: purpose of funds expanded, conditions added]
-
SB39
State veterans cemetery access road in Washburn County: local roads improvement program grant [Sec. 307, 9148 (3)]
-
SB40
STH 13 reconstruction project in City of Colby: DOT to start in 2008-09 fiscal year [Enrolled SB-40: Sec. 9148 (12t)]
-
SB40
STH 23 major highway development project: DOT to begin by set date [Enrolled SB-40: Sec. 2524g]
-
SB40
STH 78 reconstruction project in Village of Merrimac: DOT to pay portion of costs to relocate water and sewer utilities [Enrolled SB-40: Sec. 2523w] -
SB40
STH 138 extension in Rock County: DOT study and report required [Enrolled SB-40: Sec. 9148 (5i)]
-
SB40
STH 21 improvement project in Winnebago County -
AB845
Transportation improvements in City of Eau Claire re certain highways: DOT study and report required [Enrolled SB-40: Sec. 9148 (9d)] -
SB40
USH 14 pavement resurfacing project in Rock and Walworth counties [Enrolled SB-40: Sec. 9148 (6i)]
-
SB40
USH 14 reconstruction project in Village of Oregon: DOT to complete in the 2007-09 fiscal biennium [Enrolled SB-40: Sec. 9148 (8n)] -
SB40
USH 51 reconstruction project in Dane County: environmental impact statement or assessment [Enrolled SB-40: Sec. 2528m] -
SB40
Winter highway maintenance grant program created -
AB833
Winter highway maintenance grant program created -
SB478
County transportation aid payment delay and state highway maintenance funding [Conf.Sub.Amdt.1]
-
MR8 AB1
Local roads improvement program: allocations increased for nonentitlement component -
OC7 SB2
Local roads improvement program: discretionary grant increases [Sec. 2555-2557] -
SB40
DOT general obligation bonding increased re Marquette interchange reconstruction project; use of proceeds to fund I94 north-south corridor reconstruction authorized [Sec. 314, 593, 2536; Enrolled SB-40: further revisions, 314b, deletes 314] -
SB40
I 43 pavement rehabilitation project in Rock County [Enrolled SB-40: Sec. 9148 (6j)] -
SB40
Overweight vehicle combinations transporting granular roofing material: DOT may issue annual or consecutive month permits under certain conditions -
AB755
Overweight vehicle combinations transporting granular roofing material: DOT may issue annual or consecutive month permits under certain conditions [S.Sub.Amdt.1: further revisions, annual or consecutive month permits changed to multiple trip permits, approval of local government with jurisdiction over streets, sunset provision] -
SB435
Southeast Wisconsin freeway rehabilitation: I 94 north-south corridor project enumerated and general obligation bonding limit increased -
OC7 SB2
Southeast Wisconsin freeway rehabilitation project: additional lane of traffic on I 94 near Wood National Cemetery prohibited [Enrolled SB-40: Sec. 2528d] -
SB40
Southeast Wisconsin freeway rehabilitation: two projects enumerated [Sec. 2525-2528] -
SB40
Tourist-oriented directional signs and attraction signs on I 94 in Milwaukee County re lakefront attractions in City of Milwaukee: DOT to install and maintain [Enrolled SB-40: Sec. 2551m, 9148 (7j)] -
SB40
Vehicles or combination of vehicles carrying agricultural crops: dates extended re exceeding weight limit exception
-
AB689
Weigh station: DOT prohibited from constructing at certain locations in Rock County before certain date; surcharge imposed at certain station and paid to the Town of La Prairie -
AB81
Weigh station: DOT prohibited from constructing at certain locations in Rock County before certain date; surcharge imposed at certain station and paid to the Town of La Prairie -
SB82
General transportation aids: reporting requirement eliminated for counties and municipalities over certain population; reduced payments for filing statements of costs late
-
SB281
General transportation aids to local governments increased [Sec. 2552-2554] -
SB40
General transportation aids to local governments increased -
OC7 SB2
Harbor Assistance Program: new local funds appropriation created in segregated transportation fund [Sec. 306]
-
SB40
Highway improvement project exceeding certain amount: DOT required to employ value engineering, report required [Enrolled SB-40: Sec. 2524p, 2531c, e, 9348 (11f), 9448 (11f)]
-
SB40
Highway improvement project that exceeds certain amount or meets certain DOT criteria: DOT required to employ value engineering; definition, exception, and report provisions -
AB134
Highway projects and state highway rehabilitation: general obligation bond debt service appropriation [Sec. 310, 315] -
SB40
Lapse to general fund from DOT limited; general obligation bonds for state highway rehabilitation program authorized [Conf.Sub.Amdt.1] -
MR8 AB1
Local roads improvement program: allocations increased for nonentitlement component -
OC7 SB2
Local roads improvement program: discretionary grant increases [Sec. 2555-2557] -
SB40
Major highway development program and state highway rehabilitation program funding increased [Conf.Sub.Amdt.1]
-
MR8 AB1
Major highway development program funding [Conf.Sub. Amdt.1] -
MR8 AB1
Major highway projects and transportation administrative facilities: level of revenue bonding revised [Sec. 2538]
-
SB40
Major highway projects and transportation administrative facilities: level of revenue bonding revised
-
OC7 SB2
Oil company assessment created -
OC7 SB2
Oil company assessment re biodiesel or ethanol blended with gasoline; revenue deposited in transportation fund [Sec. 687, 2167, 2496, 9141 (2), 9341 (15)] -
SB40
Pupil transportation aid: funding source changed from general to transportation fund [Sec. 4, 238-240, 2730-2732, 2740, 2747, 2749] -
SB40
Sales and use taxes on motor vehicles and motor vehicle parts, products, and services: DOR to estimate revenue generated and transfer certain amount to the transportation fund [A.Sub.Amdt.1 or A.Amdt.1; deleted by Conf.Sub.Amdt.1]
-
SB40
Single registration plate for motor vehicles authorized; transportation fund and DOA Secretary provisions
-
SB141
State trunk and connecting highways development or improvement: JCF to lapse to transportation fund amount requested by DOT for fiscal year 2006-07 [Sec. 9248 (1)]
-
AB72
State trunk and connecting highways development or improvement: JCF to lapse to transportation fund amount requested by DOT for fiscal year 2006-07 [Sec. 9248 (1); S.Sub.Amdt.1: purpose of funds expanded, conditions added]
-
SB39
Transportation fund: amount transferred to general fund -
MR8 AB1
Transportation fund balance and appropriation reductions: JCF approval [Enrolled SB-40: Sec. 2541r, 2550p]
-
SB40
Transportation fund use restrictions re executive budget bill [Enrolled SB-40: Sec. 85b, 687f] -
SB40
/2007/related/subject_index/index
true
subjectindex
/2007/related/subject_index/index/q_r/road___construction_and_repair/_18
section
true