AB649-ASA1-AA2,2,22 214. Page 53, line 11: delete the material beginning with ", and a goal" and
22ending with "cooperative," on line 13.
AB649-ASA1-AA2,2,23 235. Page 53, line 19: delete lines 19 to 22.
AB649-ASA1-AA2,2,24 246. Page 54, line 5: delete lines 5 to 17.
AB649-ASA1-AA2,2,25
17. Page 55, line 14: delete lines 14 to 20 and substitute:
AB649-ASA1-AA2,3,13 2"2. `Municipal utilities and retail electric cooperatives.' Except as provided in
3sub. (7) (bg), every 4 years, each municipal utility and retail electric cooperative shall
4establish a goal for the reduction in demand for and use of each regulated fuel that
5can be achieved under a commitment to community program and establish funding
6requirements for the commitment to community program. The commitment to
7community program shall be designed to achieve all cost-effective energy efficiency
8and load management program savings. The minimum funding requirement that
9a municipal utility or retail electric cooperative may establish for a year under this
10subdivision shall correspond to a monthly fee imposed on each customer or member
11that collects an annual average of $8 per meter. Each municipal utility and retail
12electric cooperative shall file with the commission a report describing the goal and
13funding requirements established under this subdivision.".
AB649-ASA1-AA2,3,15 148. Page 65, line 13: delete "proceeding under sub. (3) (bc)" and substitute
15"filing of a report under sub. (3) (br) 2.".
AB649-ASA1-AA2,3,16 169. Page 65, line 14: after "amount" insert "of funding".
AB649-ASA1-AA2,3,17 1710. Page 66, line 16: delete "determined for" and substitute "determined by".
AB649-ASA1-AA2,3,18 1811. Page 66, line 16: delete "(bn)" and substitute "(br) 2.".
AB649-ASA1-AA2,3,19 1912. Page 66, line 17: delete "1. f.".
AB649-ASA1-AA2,3,20 2013. Page 66, line 24: delete lines 24 and 25 and substitute:
AB649-ASA1-AA2,3,22 21"3. Prepare and provide reports under sub. (3) (br) 2. and statements under par.
22(dm) on behalf of the municipal utility or retail electric cooperative.".
AB649-ASA1-AA2,4,2
114. Page 68, line 15: delete "effectiveness" and substitute "effectiveness
2performance".
AB649-ASA1-AA2,4,4 315. Page 68, line 17: after "fuels" insert "and achieving load management
4program savings
".
AB649-ASA1-AA2,4,5 516. Page 68, line 19: delete lines 19 to 21 and substitute:
AB649-ASA1-AA2,4,8 6"196.374 (7) (e) 1. e. The amount of reduction in the demand for and use of each
7target fuel and the load management program savings that have resulted in the year
8under the programs.".
AB649-ASA1-AA2,4,10 917. Page 68, line 24: delete the material beginning with that line and ending
10with page 69, line 5, and substitute:
AB649-ASA1-AA2,4,16 11"196.374 (8) (d) Exceptions. An energy utility that spends pays to a statewide
12programs contractor
the full amount required under sub. (3) (b) 2. (bw) 3. or 3g. in
13any year is considered to have satisfied its requirements under this section for that
14year. A municipal utility or retail electric cooperative that spends the full amount
15required under sub. (7) (am) in any year is considered to have satisfied its
16requirements under this section for that year.
".
AB649-ASA1-AA2,4,18 1718. Page 69, line 8: after "(bc)" insert "and the filing of each report under sub.
18(3) (br) 2.".
AB649-ASA1-AA2,4,20 1919. Page 69, line 9: delete "fuel that is" and substitute "fuel and the load
20management program savings that are".
AB649-ASA1-AA2,4,21 2120. Page 69, line 13: delete "or f. or 2. c." and substitute "or 2. c. or (br) 2.".
AB649-ASA1-AA2,4,22 2221. Page 71, line 6: delete lines 6 to 9.
AB649-ASA1-AA2,4,23 2322. Page 71, line 21: after that line insert:
AB649-ASA1-AA2,5,3
1"1m. An order directing a statewide programs contractor or person to consult
2with the commission regarding ways to modify the program to ensure the program
3will achieve the goal.".
AB649-ASA1-AA2,5,4 423. Page 72, line 3: after that line insert:
AB649-ASA1-AA2,5,5 5"c. Any other remedy specified by the commission.".
AB649-ASA1-AA2,5,6 624. Page 72, line 4: delete lines 4 and 5 and substitute:
AB649-ASA1-AA2,5,7 7"3. For a goal under a utility-administered or large energy customer program:
AB649-ASA1-AA2,5,88 a. An order modifying or terminating the program.
AB649-ASA1-AA2,5,99 b. Any other remedy specified by the commission.".
AB649-ASA1-AA2,5,10 1025. Page 72, line 6: delete lines 6 to 15.
Loading...
Loading...