LRBa2452/1
MDK:kjf:rs
2009 - 2010 LEGISLATURE
ASSEMBLY AMENDMENT 2,
TO ASSEMBLY SUBSTITUTE AMENDMENT 1,
TO 2009 ASSEMBLY BILL 649
April 20, 2010 - Offered by Representatives Hraychuck, Shilling, Smith, Dexter
and Danou.
AB649-ASA1-AA2,1,11 At the locations indicated, amend the substitute amendment as follows:
AB649-ASA1-AA2,1,3 21. Page 39, line 13: delete the material beginning with that line and ending
3with page 40, line 19, and substitute:
AB649-ASA1-AA2,1,4 4" Section 62m. 196.025 (1) (b) 1. of the statutes is amended to read:
AB649-ASA1-AA2,1,105 196.025 (1) (b) 1. In a proceeding in which an investor-owned electric public
6utility is a party, the commission shall not order or otherwise impose energy
7conservation or efficiency requirements on the investor-owned electric public utility
8if the commission has fulfilled all of its duties under s. 196.374 and the
9investor-owned electric public utility has satisfied the requirements of s. 196.374 for
10the year prior to commencement of the proceeding, as specified in s. 196.374 (8) (d).
AB649-ASA1-AA2, s. 64m 11Section 64m. 196.025 (1) (b) 2. of the statutes is amended to read:
AB649-ASA1-AA2,2,11
1196.025 (1) (b) 2. In a proceeding in which a wholesale supplier that has
2accepted an assignment from a municipal utility or retail electric cooperative under
3s. 196.374 (7) (bg)
is a party, the commission shall not order or otherwise impose
4energy conservation or efficiency requirements on the wholesale supplier or any
5municipal utility or retail electric cooperative that made the assignment
if the
6commission has fulfilled all of its duties under s. 196.374 and the wholesale
7supplier's members are in the aggregate substantially in compliance with s. 196.374
8(7)
the wholesale supplier or all municipal utilities or retail electric cooperatives from
9which the wholesale supplier has accepted assignment have satisfied the
10requirements of s. 196.374 for the year prior to commencement of the proceeding, as
11specified in s. 196.374 (8) (d)
.".
AB649-ASA1-AA2,2,12 122. Page 42, line 20: delete lines 20 to 25 and substitute:
AB649-ASA1-AA2,2,19 13"196.374 (1) (b) "Commitment to community program" means an energy
14efficiency or load management program by or on behalf for regulated fuel usage in
15the service territory
of a municipal utility or retail electric cooperative, a load
16management program by or on behalf of a municipal utility or retail electric
17cooperative, or a renewable resource program involving customer applications of
18renewable resources that take place at the premises of the customers or members of
19a municipal utility or retail electric cooperative
.".
AB649-ASA1-AA2,2,20 203. Page 53, line 8: after " goals" insert "; statewide programs".
AB649-ASA1-AA2,2,22 214. Page 53, line 11: delete the material beginning with ", and a goal" and
22ending with "cooperative," on line 13.
AB649-ASA1-AA2,2,23 235. Page 53, line 19: delete lines 19 to 22.
AB649-ASA1-AA2,2,24 246. Page 54, line 5: delete lines 5 to 17.
AB649-ASA1-AA2,2,25
17. Page 55, line 14: delete lines 14 to 20 and substitute:
AB649-ASA1-AA2,3,13 2"2. `Municipal utilities and retail electric cooperatives.' Except as provided in
3sub. (7) (bg), every 4 years, each municipal utility and retail electric cooperative shall
4establish a goal for the reduction in demand for and use of each regulated fuel that
5can be achieved under a commitment to community program and establish funding
6requirements for the commitment to community program. The commitment to
7community program shall be designed to achieve all cost-effective energy efficiency
8and load management program savings. The minimum funding requirement that
9a municipal utility or retail electric cooperative may establish for a year under this
10subdivision shall correspond to a monthly fee imposed on each customer or member
11that collects an annual average of $8 per meter. Each municipal utility and retail
12electric cooperative shall file with the commission a report describing the goal and
13funding requirements established under this subdivision.".
AB649-ASA1-AA2,3,15 148. Page 65, line 13: delete "proceeding under sub. (3) (bc)" and substitute
15"filing of a report under sub. (3) (br) 2.".
AB649-ASA1-AA2,3,16 169. Page 65, line 14: after "amount" insert "of funding".
AB649-ASA1-AA2,3,17 1710. Page 66, line 16: delete "determined for" and substitute "determined by".
AB649-ASA1-AA2,3,18 1811. Page 66, line 16: delete "(bn)" and substitute "(br) 2.".
AB649-ASA1-AA2,3,19 1912. Page 66, line 17: delete "1. f.".
AB649-ASA1-AA2,3,20 2013. Page 66, line 24: delete lines 24 and 25 and substitute:
AB649-ASA1-AA2,3,22 21"3. Prepare and provide reports under sub. (3) (br) 2. and statements under par.
22(dm) on behalf of the municipal utility or retail electric cooperative.".
AB649-ASA1-AA2,4,2
114. Page 68, line 15: delete "effectiveness" and substitute "effectiveness
2performance".
AB649-ASA1-AA2,4,4 315. Page 68, line 17: after "fuels" insert "and achieving load management
4program savings
".
AB649-ASA1-AA2,4,5 516. Page 68, line 19: delete lines 19 to 21 and substitute:
AB649-ASA1-AA2,4,8 6"196.374 (7) (e) 1. e. The amount of reduction in the demand for and use of each
7target fuel and the load management program savings that have resulted in the year
8under the programs.".
AB649-ASA1-AA2,4,10 917. Page 68, line 24: delete the material beginning with that line and ending
10with page 69, line 5, and substitute:
AB649-ASA1-AA2,4,16 11"196.374 (8) (d) Exceptions. An energy utility that spends pays to a statewide
12programs contractor
the full amount required under sub. (3) (b) 2. (bw) 3. or 3g. in
13any year is considered to have satisfied its requirements under this section for that
14year. A municipal utility or retail electric cooperative that spends the full amount
15required under sub. (7) (am) in any year is considered to have satisfied its
16requirements under this section for that year.
".
AB649-ASA1-AA2,4,18 1718. Page 69, line 8: after "(bc)" insert "and the filing of each report under sub.
18(3) (br) 2.".
AB649-ASA1-AA2,4,20 1919. Page 69, line 9: delete "fuel that is" and substitute "fuel and the load
20management program savings that are".
AB649-ASA1-AA2,4,21 2120. Page 69, line 13: delete "or f. or 2. c." and substitute "or 2. c. or (br) 2.".
AB649-ASA1-AA2,4,22 2221. Page 71, line 6: delete lines 6 to 9.
AB649-ASA1-AA2,4,23 2322. Page 71, line 21: after that line insert:
AB649-ASA1-AA2,5,3
1"1m. An order directing a statewide programs contractor or person to consult
2with the commission regarding ways to modify the program to ensure the program
3will achieve the goal.".
AB649-ASA1-AA2,5,4 423. Page 72, line 3: after that line insert:
AB649-ASA1-AA2,5,5 5"c. Any other remedy specified by the commission.".
AB649-ASA1-AA2,5,6 624. Page 72, line 4: delete lines 4 and 5 and substitute:
AB649-ASA1-AA2,5,7 7"3. For a goal under a utility-administered or large energy customer program:
AB649-ASA1-AA2,5,88 a. An order modifying or terminating the program.
AB649-ASA1-AA2,5,99 b. Any other remedy specified by the commission.".
AB649-ASA1-AA2,5,10 1025. Page 72, line 6: delete lines 6 to 15.
Loading...
Loading...