LRBa2101/1
RCT&RNK:med:rs
2011 - 2012 LEGISLATURE
ASSEMBLY AMENDMENT 7,
TO 2011 ASSEMBLY BILL 426
January 20, 2012 - Offered by Representative Williams.
AB426-AA7,1,3
21. Page 143, line 6: delete lines 6 to 10 and substitute "shall approve the
3location of each high capacity well as part of the permit issued under sub. (4).".
AB426-AA7,1,10
63. Page 146, line 3: delete the material beginning with "If" and ending with
7", the" on line 8 and substitute "As part of its determination under par. (a), the
8department shall consider whether the public benefits resulting from the mining
9operation or bulk sampling exceed any injury to public rights and interests in a body
10of water that is affected by the mining operation or bulk sampling. The".
AB426-AA7,2,5
4"(b) An applicant for a mining permit shall pay any fee required under s.
5281.343 (3) (c) 1.".
AB426-AA7,2,10
9"
(2) (a) If there is a conflict between a provision in this subchapter and a
10provision in s. 281.343, the provision in s. 281.343 controls.
AB426-AA7,2,1211
(b) If there is a conflict between a provision in this subchapter and a provision
12in s. 281.346, the provision in s. 281.346 controls, except as provided in s. 295.57 (9).".