SB368-ASA1, s. 135 9Section 135. 281.37 (3) (d) of the statutes is renumbered 281.36 (3t) (d) and
10amended to read:
SB368-ASA1,42,1311 281.36 (3t) (d) Baseline studies of the wetland wetlands that will be affected
12by the permitted activity discharges and of the sites for mitigation project site
13projects.
SB368-ASA1, s. 136 14Section 136. 281.37 (3) (e) of the statutes is renumbered 281.36 (3t) (e) and
15amended to read:
SB368-ASA1,42,2016 281.36 (3t) (e) Plan and project design requirements for a mitigation project,
17which shall consider the relation of the project design
projects and mitigation bank
18sites, which shall include requirements for relating the design of a mitigation project
19or a mitigation bank site
to the hydrology of the watershed in which a mitigation
20project or mitigation bank site is located.
SB368-ASA1, s. 137 21Section 137. 281.37 (3) (f) of the statutes is renumbered 281.36 (3t) (f), and
22281.36 (3t) (f) (intro.), as renumbered, is amended to read:
SB368-ASA1,43,223 281.36 (3t) (f) (intro.) The comparability of a wetland Standards for comparing
24wetlands
that will be restored, enhanced or, created, or preserved as a mitigation

1project or at a mitigation bank site
to the wetland wetlands that will be adversely
2affected by the permitted activity discharges, including all of the following:
SB368-ASA1, s. 138 3Section 138. 281.37 (3) (g) of the statutes is repealed.
SB368-ASA1, s. 139 4Section 139. 281.37 (3) (h) of the statutes is renumbered 281.36 (3t) (h) and
5amended to read:
SB368-ASA1,43,96 281.36 (3t) (h) Standards for measuring the short-term and long-term success
7of a mitigation project projects and mitigation bank sites and requirements for the
8short-term and long-term monitoring of a mitigation project projects and
9mitigation bank sites
.
SB368-ASA1, s. 140 10Section 140. 281.37 (3) (i) of the statutes is renumbered 281.36 (3t) (i) and
11amended to read:
SB368-ASA1,43,1612 281.36 (3t) (i) Remedial actions to be taken by the applicant if a holders of
13wetland individual permits for
mitigation project is projects that are not successful
14and actions to be taken by a wetlands mitigation bank if a banks for mitigation
15project on which mitigation credits are based is projects performed by the mitigation
16banks that are
not successful.
SB368-ASA1, s. 141 17Section 141. 281.37 (3) (j) of the statutes is repealed.
SB368-ASA1, s. 142 18Section 142. 281.37 (3m) of the statutes is repealed.
SB368-ASA1, s. 143 19Section 143. 281.37 (4) of the statutes is repealed.
SB368-ASA1, s. 144 20Section 144. 281.37 (5) (title) of the statutes is renumbered 281.36 (13m)
21(title).
SB368-ASA1, s. 145 22Section 145. 281.37 (5) of the statutes is renumbered 281.36 (13m) (a).
SB368-ASA1, s. 146 23Section 146. 281.98 (1) of the statutes is amended to read:
SB368-ASA1,44,424 281.98 (1) Except as provided in ss. 281.344 (14) (a), 281.36, 281.346 (14) (a),
25281.47 (1) (d), 281.75 (19), and 281.99 (2), any person who violates this chapter or any

1rule promulgated or any plan approval, license, special order, or water quality
2certification issued under this chapter shall forfeit not less than $10 nor more than
3$5,000 for each violation. Each day of continued violation is a separate offense.
4While an order is suspended, stayed, or enjoined, this penalty does not accrue.
SB368-ASA1, s. 147 5Section 147. 814.04 (intro.) of the statutes, as affected by 2011 Wisconsin Act
62
, is amended to read:
SB368-ASA1,44,11 7814.04 Items of costs. (intro.) Except as provided in ss. 93.20, 100.195 (5m)
8(b), 100.30 (5m), 106.50 (6) (i) and (6m) (a), 111.397 (2) (a), 115.80 (9), 281.36 (2) (b)
91.,
767.553 (4) (d), 769.313, 802.05, 814.245, 895.035 (4), 895.044, 895.443 (3),
10895.444 (2), 895.445 (3), 895.446 (3), 895.506, 943.212 (2) (b), 943.245 (2) (d), 943.51
11(2) (b), and 995.10 (3), when allowed costs shall be as follows:
SB368-ASA1, s. 148 12Section 148. Nonstatutory provisions.
SB368-ASA1,44,1613 (1) Position authorizations. The authorized FTE positions for the department
14of natural resources are increased by 2.0 PR positions to be funded from the
15appropriation under section 20.370 (4) (bi) of the statutes, to implement the
16mitigation program under section 281.36 (3r) of the statutes as created in this act.
SB368-ASA1,44,1717 (2) Project position changes.
SB368-ASA1,44,2018 (a) The authorized FTE positions for the department of natural resources are
19decreased by 3.0 PR project positions funded from the appropriation under section
2020.370 (4) (bi) of the statutes, for the purpose for which the appropriation is made.
SB368-ASA1,44,2421 (b) The authorized FTE positions for the department of natural resources are
22increased by 3.0 PR positions to be funded from the appropriation under section
2320.370 (4) (bi) of the statutes, for the purpose of providing wetland identification and
24confirmation services under section 23.321 of the statutes, as affected by this act.
SB368-ASA1, s. 149 25Section 149. Initial applicability.
SB368-ASA1,45,5
1(1) The treatment of sections 30.28 (2m) (c), 31.39 (2m) (c), 281.22 (2) (c), and
2281.36 (3m), (3n), (3p), (3q), (3r), and(12) (a) and (b) of the statutes, the renumbering
3of section 30.28 (1) of the statutes, and the creation of section 30.28 (1) (a) and (b) of
4the statutes first apply to applications that are submitted to the department of
5natural resources on the effective date of this subsection.
SB368-ASA1,45,76 (2) The treatment of section 281.36 (14) of the statutes first applies to violations
7committed on the effective date of this subsection.
SB368-ASA1, s. 150 8Section 150. Effective date.
SB368-ASA1,45,109 (1) This act takes effect on the first day of the 4th month beginning after
10publication.