warch, richardWarch, Richard
Life and service of the retired Lawrence University president commended upon his death [AJR 66] - JR27
warehouseWarehouse
New dairy plant, food warehouse, food processing plant, retail food establishment, or meat establishment license: uniform expiration date modified - Act 302
warren knowles_gaylord nelson stewardship programWarren Knowles-Gaylord Nelson Stewardship Program, see Natural resource
washington, town ofWashington, Town of, see Door County
Ballast water discharge general permit fees [Sec. 2103, 2104] - Act 20
Clean Water Fund Program and Safe Drinking Water Loan Program subsidies set for 2013-15 fiscal biennium [Sec. 478v, 479, 2093-2094, 2095-2096c] - Act 20
Clean Water Fund Program and Safe Drinking Water Loan Program revisions re providing financial assistance - Act 7
Contaminated sediment removal from Lake Michigan, Lake Superior, or certain tributaries: general obligation bonding authority increased [Sec. 482] - Act 20
Environmental repair tipping fee use for nonpoint water pollution abatement [Sec. 9132 (1c)] - Act 20
Erosion control laws for construction sites with a land disturbance area of one or more acres transferred to DNR from DSPS; storm water discharge permit provision and statewide uniform standard required; ordinance stricter than uniform standard permitted under certain conditions [Sec. 574, 575, 575ag-ar, 1245-1247, 1252-1257, 1259-1261, 1568m, 1628, 1711, 1712, 2088-2092e, 2097-2102, 9138 (2)] - Act 20
Ferrous metallic mining regulations and permit process created; nonferrous metallic mining regulations and permit process revised; DNR, wetlands, water, mining waste, fees, occupational tax, utility facility approvals, and local impact committee provisions - Act 1
Nonpoint source water pollution abatement projects: general obligation bonding authority increased [Sec. 480] - Act 20
Phosphorus in state waters: statewide variance to water quality rules for certain dischargers and conditions specified, DOA and DNR duties; adaptive management to achieve compliance with water quality standard permitted - Act 378
Urban nonpoint source water pollution abatement, storm water management, and municipal flood control and riparian restoration projects: general obligation bonding authority increased [Sec. 481] - Act 20
Wastewater discharge permit for a publicly owned sewage treatment or collection system: prohibition on DNR requiring more than one eliminated - Act 70
water supplyWater supply, see also Wells
Clean Water Fund Program and Safe Drinking Water Loan Program subsidies set for 2013-15 fiscal biennium [Sec. 478v, 479, 2093-2094, 2095-2096c] - Act 20
Clean Water Fund Program and Safe Drinking Water Loan Program revisions re providing financial assistance - Act 7
Joint local water authority: eligibility in the safe drinking water loan program and utility facilities owned by to be included in municipal utility facilities subject to cost sharing when relocation or replacement is required due to freeway construction - Act 12
Soil and Water Resource Management Program bonding authority increased [Sec. 488] - Act 20
Tax credits sunsetted re relocated business, community development finance, biodiesel fuel, dairy and livestock farm, dairy manufacturing, meat processing, woody biomass, food processing plant, Internet equipment, film production, HIRSP assessment, fuel pumps, postsecondary education, water consumption, beginning farmer, research facilities, and qualified research [Sec. 1304d-f, 1331d, 1338b-u, 1344b-d, em-g, 1345b-e, 1347b-f, 1348d, e, 1383j, 1390b-u, 1395b-e, f-h, 1396b-1398f, i-L, 1419h, 1426b-u, 1431b-e, es-h, 1432b-1434f, i-L] - Act 20
waterways and water powerWaterways and water power, see also Harbor; Lakes; Shoreland zoning; Wetland
Dam ownership: disclosure to prospective buyers on real estate condition report or vacant land disclosure report required; underground storage tank regulation transferred to DATCP updated on the reports - Act 304
Dam safety programs: DNR bonding authority increased [Sec. 483] - Act 20
Erosion control laws for construction sites with a land disturbance area of one or more acres transferred to DNR from DSPS; storm water discharge permit provision and statewide uniform standard required; ordinance stricter than uniform standard permitted under certain conditions [Sec. 574, 575, 575ag-ar, 1245-1247, 1252-1257, 1259-1261, 1568m, 1628, 1711, 1712, 2088-2092e, 2097-2102, 9138 (2)] - Act 20
Ferrous metallic mining regulations and permit process created; nonferrous metallic mining regulations and permit process revised; DNR, wetlands, water, mining waste, fees, occupational tax, utility facility approvals, and local impact committee provisions - Act 1
``Land surveying" replaced with ``practice of professional land surveying" and definition revised; license replaces certificate of registration; examining board and section names changed; apprenticeship path to licensure eliminated; certain registration exemptions eliminated; other revisions re town survey to erect monuments, cemetery authority plat or map, ordinary high water mark included on certain maps or plats, subdivision plats, certified survey maps, and recording certain plats - Act 358
``Rock River Trail Scenic and Historic Route": DOT to designate and mark highway route in specified counties; contributions from interested parties required - Act 30
Sea lamprey control program created, appropriation provision - Act 72
Southeastern Wisconsin Fox River Commission: funding from recreational boating aids [Sec. 286p, r, 9132 (4u), 9432 (1u)] - Act 20
State trail system to include water trails, signs provision; list of specific persons who may use state trails eliminated - Act 248
Urban nonpoint source water pollution abatement, storm water management, and municipal flood control and riparian restoration projects: general obligation bonding authority increased [Sec. 481] - Act 20
Wisconsin River monitoring and nutrient study modified [Sec. 284d, 2087v] - Act 20
waterworksWaterworks
Joint local water authority: eligibility in the safe drinking water loan program and utility facilities owned by to be included in municipal utility facilities subject to cost sharing when relocation or replacement is required due to freeway construction - Act 12
waukesha, city ofWaukesha, City of
LaPorte, Joseph Charles: life and public service to the people of the City of Waukesha commended [SJR25] - JR14
waukesha countyWaukesha County
Brookfield, Town of, authorized to create TIDs in the same way and under the same conditions as a city or village - Act 51
Jeskewitz, James: life and commitment to the Menomonee Falls community commended upon his death [SJR63] - JR21
TID number 1 in the Village of Wales: expenditure period and allocation period extended - Act 90
wausau, city ofWausau, City of, see Marathon County
wca _wisconsin consumer act_WCA (Wisconsin Consumer Act), see Consumer protection
Weights and measures department: municipalities required to establish may contract with a private service provider [A.Sub.Amdt.1: Sec. 1593v] [vetoed] - Act 20
wellsWells
Ferrous metallic mining regulations and permit process created; nonferrous metallic mining regulations and permit process revised; DNR, wetlands, water, mining waste, fees, occupational tax, utility facility approvals, and local impact committee provisions - Act 1
High capacity wells: consideration of cumulative impacts [Sec. 2092g, 9332 (2L), 9432 (2L)] - Act 20
wetlandWetland
DNR duty revisions re reports of violations, citation procedure re wetland discharge violations, minimum age for sturgeon spearing license, Dry Cleaner Environmental Response Council membership, and publishing class 1 notices for certain permit applications - Act 69
Ferrous metallic mining regulations and permit process created; nonferrous metallic mining regulations and permit process revised; DNR, wetlands, water, mining waste, fees, occupational tax, utility facility approvals, and local impact committee provisions - Act 1
Ponds located entirely on private property: fishing without a license permitted [Sec. 562g-r] - Act 20
Wetland mitigation: escrow subprogram established [Sec. 284e, 2092j-u] - Act 20
whs _wisconsin historical society_WHS (Wisconsin Historical Society), see Historical society
USH 12 highway project from City of Elkhorn to City of Whitewater: environmental impact statement required [Sec. 1534h] - Act 20
wild animalWild animal, see Hunting
wireless telecommunicationsWireless telecommunications, see Telecommunications
wisconsin consumer act _wca_Wisconsin Consumer Act (WCA), see Consumer protection
wisconsin historical society _whs_Wisconsin Historical Society (WHS), see Historical society
wisconsin rapids, city ofWisconsin Rapids, City of, see Wood County
wisconsin sharesWisconsin Shares, see Day care
wisconsin uniform securities lawWisconsin Uniform Securities Law, see Securities -- Regulation
wisconsin worksWisconsin Works
Children's services network requirement of a W-2 agency eliminated; nomination of members to the Milwaukee Child Welfare Partnership Council modified - Act 225
Public assistance programs including W-2, MA, and FoodShare: offenses considered crimes against government and its administration and DOJ or a DA is authorized to prosecute - Act 226
Loading...
Loading...