115th Fighter Wing stationed at Truax Field Air National Guard Base Wisconsin: federal, state, and local contributions recognized - SJR55
Adjutant General report on sexual assault and sexual harassment reported by Wisconsin National Guard members; DMA report on substantive changes to the federal Uniform Code of Military Justice required - AB178
Adjutant General report on sexual assault and sexual harassment reported by Wisconsin National Guard members; DMA report on substantive changes to the federal Uniform Code of Military Justice required - SB167
Casework related to misconduct within the Wisconsin National Guard: DMA to establish and maintain case management system - AB179
Casework related to misconduct within the Wisconsin National Guard: DMA to establish and maintain case management system - SB168
Discrimination on basis of person’s gender identity or gender expression prohibited - AB501
Discrimination on basis of person’s gender identity or gender expression prohibited - SB474
Medical research informed consent requirements created; chief surgeons of the U.S. Army and U.S. Air Force provision - AB1076
Medical research informed consent requirements created; chief surgeons of the U.S. Army and U.S. Air Force provision - SB1020
Tuition grant program for National Guard members: DMA administration changes - AB772
Tuition grant program for National Guard members: DMA administration changes - SB744
Veteran status indicated on operator’s license or state ID card: "veteran" includes current or former armed forces, reserve unit, or National Guard members - AB780
Veteran status indicated on operator’s license or state ID card: "veteran" includes current or former armed forces, reserve unit, or National Guard members - SB748
Wisconsin Code of Military Justice changes re sexual assault and sexual harassment; Wisconsin National Guard training provision; reports required [Sec. 2706, 2707, 2709-2711, 2714-2726, 9331 (1), (2)] - AB43
Wisconsin Code of Military Justice changes re sexual assault and sexual harassment; Wisconsin National Guard training provision; reports required [Sec. 2706, 2707, 2709-2711, 2714-2726, 9331 (1), (2)] [original bill only] - SB70
natural disasterNatural disaster, see also Floodplain management
Continuity of government: striking “resulting from enemy action in the form of an attack” to include other causes. Constitutional amendment (1st consideration) - AJR99
Continuity of government: striking “resulting from enemy action in the form of an attack” to include other causes. Constitutional amendment (1st consideration) - SJR93
Hazard Mitigation Revolving Loan Fund and program created; FEMA and DMA agreement, and DOA duties - SB64
Pre-disaster flood resilience grants from DEM [S.Sub.Amdt.2: Sec. 130] - SB70
Silver Cliff, Town of: payments from state disaster assistance appropriation to rebuild public safety building destroyed by a tornado [Sec. 9131 (1)] - AB43
Silver Cliff, Town of: payments from state disaster assistance appropriation to rebuild public safety building destroyed by a tornado [Sec. 9131 (1); S.Sub.Amdt.2: further revisions, Sec. 9131 (1)] - SB70
Water Fund for Our Future trust fund created; Joint Committee for the Oversight of the Water Fund for Our Future joint standing committee created - AB1183
Water Fund for Our Future trust fund created; Joint Committee for the Oversight of the Water Fund for Our Future joint standing committee created - SB1087
Wisconsin Climate Corps (WCC) program and board created, audit and report provisions - AB810
Wisconsin Climate Corps (WCC) program and board created, audit and report provisions - SB762
natural gasNatural gas, see Fuel
natural resourceNatural resource
Endangered resources program: limit on appropriation to match gifts, grants, and bequests increased [Sec. 354] - AB43
Endangered resources program: limit on appropriation to match gifts, grants, and bequests increased [Sec. 354] [original bill only] - SB70
Habitat work plan: DNR required to prepare biennially - AB157
Habitat work plan: DNR required to prepare biennially [S.Amdt.1: report to JCF added] - SB159
Stewardship Program activities or projects: affected local governments required to adopt resolution in support before DNR can submit to JCF for passive review [A.Amdt.2: further revisions] - AB245
Stewardship Program activities or projects: affected local governments required to adopt resolution in support before DNR can submit to JCF for passive review - SB301
Warren Knowles-Gaylord Nelson Stewardship 2000 program: changes to land acquisition requiring JCF approval; written directory of stewardship land open for public access requirement repealed [Sec. 572, 573, 576-578] - AB43
Warren Knowles-Gaylord Nelson Stewardship 2000 program: changes to land acquisition requiring JCF approval; written directory of stewardship land open for public access requirement repealed [Sec. 572, 573, 576-578] [original bill only] - SB70
Warren Knowles-Gaylord Nelson Stewardship 2000 program: lapse from capital improvement fund [Sec. 366, 367, 574, 575] - AB43
Warren Knowles-Gaylord Nelson Stewardship 2000 program: lapse from capital improvement fund [Sec. 366, 367, 574, 575] [original bill only] - SB70
natural resources department of _ administrationNatural Resources, Department of — Administration
Ballast water discharge permit replaced with fee on commercial vessels subject to the federal Vessel Incidental Discharge Act; DNR memorandum of understanding with U.S. Coast Guard [Sec. 358, 2663, 2675-2677, 9132 (8), 9432 (3)] - AB43
Ballast water discharge permit replaced with fee on commercial vessels subject to the federal Vessel Incidental Discharge Act; DNR memorandum of understanding with U.S. Coast Guard [Sec. 358, 2663, 2675-2677, 9132 (8), 9432 (3)] [original bill only] - SB70
Buffalo Lake Protection and Rehabilitation District grant [S.Sub.Amdt.2: Sec. 9132 (4)] - SB70
CAFO WPDES permit fee increased [Sec. 2662] - AB43
CAFO WPDES permit fee increased [Sec. 2662] [original bill only] - SB70
DNR deputy secretary position eliminated [S.Sub.Amdt.2: Sec. 196] - SB70
DNR division administrator positions reduced [S.Sub.Amdt.2: Sec. 430] - SB70
Environmental impacts to vulnerable communities: DNR prohibited from issuing certain permits unless applicant complies with reporting requirements - AB796
Fill on bed of the Great Lakes and certain rivers and harbors: establishing lawful public or private use of; claim provision - AB579
Fill on bed of the Great Lakes and certain rivers and harbors: establishing lawful public or private use of; claim provision [S.Sub.Amdt.2: further revisions, specific rivers changed to river waterfront property] - SB541
Forest nursery stock seedling surcharge repealed [S.Sub.Amdt.2: Sec. 216] - SB70
Hunting and fishing approvals: certain nonresident fees increased; conservation fund provision [S.Sub.Amdt.2: Sec. 144, 217-231, 9232 (1)] - SB70
ID card issued by DOT to establish residency for DNR approvals allowed; DOT to allow DNR access to certain records - AB306
ID card issued by DOT to establish residency for DNR approvals allowed; DOT to allow DNR access to certain records - SB310
Lac du Flambeau band of Lake Superior Chippewa: unencumbered balance in appropriation revert to Indian gaming receipts appropriation [Sec. 379] - AB43
Lac du Flambeau band of Lake Superior Chippewa: unencumbered balance in appropriation revert to Indian gaming receipts appropriation [Sec. 379] [original bill only] - SB70
Large dams: permit and approval fees changed [Sec. 635, 636, 9432 (1)] - AB43
Large dams: permit and approval fees changed [Sec. 635, 636, 9432 (1)] [original bill only] - SB70
Nonpoint source water pollution abatement: bonding authority increased [Sec. 547] - AB43
Nonpoint source water pollution abatement: bonding authority increased [Sec. 547; S.Sub.Amdt.2: further revisions, appropriation created, Sec. 80] - SB70
PFAS group of substances: DNR to establish and enforce standards, emergency rules provision [Sec. 2321-2323, 2643, 2665, 2667, 2668, 2672, 2673, 9132 (3)-(6), 9432 (2)] - AB43
PFAS group of substances: DNR to establish and enforce standards, emergency rules provision [Sec. 2321-2323, 2643, 2665, 2667, 2668, 2672, 2673, 9132 (3)-(6), 9432 (2)] [original bill only] - SB70
PFAS proposed rule that exceeds economic impact analyses: DNR authorized to resume permanent rule-making process (introduced per s. 227.139 (2)(a), Wis.Stats.) - AB1173
PFAS proposed rule that exceeds economic impact analyses: DNR authorized to resume permanent rule-making process (introduced per s. 227.139 (2)(a), Wis.Stats.) - SB1079
PFAS trust fund created [S.Sub.Amdt.2: Sec. 79, 197, 210, 9232 (2)-(4)] - SB70
Products containing PFAS that were intentionally added: sale or distribution of prohibited; DNR provision - AB1194
Products containing PFAS that were intentionally added: sale or distribution of prohibited; DNR provision - SB1093
Terrestrial invasive species prevention: appropriation from conservation fund [Sec. 365] - AB43
Terrestrial invasive species prevention: appropriation from conservation fund [Sec. 365] [original bill only] - SB70
Water resources account lapse to the conservation fund [Sec. 9232 (2)] - AB43
Water resources account lapse to the conservation fund [Sec. 9232 (2)] [original bill only] - SB70
Well construction notification fee increased [Sec. 2644] - AB43
Well construction notification fee increased [Sec. 2644] [original bill only] - SB70
Well construction variances application fee [Sec. 2645] - AB43
Well construction variances application fee [Sec. 2645] [original bill only] - SB70
Well drilling, heat exchange drilling, or pump installing license applicants: exam administration (remedial legislation suggested by DNR) - AB1102
Well drilling, heat exchange drilling, or pump installing license applicants: exam administration (remedial legislation suggested by DNR) - SB1055
WPDES permit violations: notification requirements [Sec. 2664, 9132 (11), 9432 (7)] - AB43
WPDES permit violations: notification requirements [Sec. 2664, 9132 (11), 9432 (7)] [original bill only] - SB70
natural resources department of _ environmental protectionNatural Resources, Department of — Environmental protection
Aquatic plant management permit program appropriation changes [Sec. 360] - AB43
Aquatic plant management permit program appropriation changes [Sec. 360] [original bill only] - SB70
Aquatic plant management plans and permit considerations and exemptions - AB318
Aquatic plant management plans and permit considerations and exemptions [S.Amdt.1: further revisions] - SB316
Artificial bodies of water re nonmetallic mining reclamation: construction or enlargement permit requirements modified; rule revised [Admin.Code NR 135.02] - AB320
Asphalt or concrete plant at nonmetallic mining site: subject to reclamation ordinances and rules; reclamation plan provisions; rules revised [Admin.Code NR 135.02, 135.03, 135.19] - AB319
Battery manufacturers required to administer battery collection and recycling programs; DNR duties; report and penalty provisions - AB1205
Clean Water Fund Program funding: projects for the reduction of infiltration and inflow in connecting laterals and sewer lines are eligible - AB100
Clean Water Fund Program funding: projects for the reduction of infiltration and inflow in connecting laterals and sewer lines are eligible - SB99
Loading...
Loading...