Approval Conditional Approval Denial No Comment
Explanation for recommendation including any conflicts with local rules and regulations and suggested conditions:
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
Industry Services Division
Petition for Variance
Information and Instructions SPS 303
In instances where exact compliance with a particular code requirement cannot be met or alternative designs are desired, the division has a petition for variance process in which it reviews and considers acceptance of alternatives which are not in strict conformance with the letter of the code, but which meet the intent of the code. A variance is not a waiver from a code requirement. The petitioner must provide an equivalency which meets the intent of the code section petitioned to obtain a variance. Documentation of the rationale for the equivalency is required. Failure to provide adequate information may delay a decision on the petition. Pictures, sketches, and plans may be submitted to support equivalency. If the proposed equivalency does not adequately safeguard the health, safety, and welfare of building occupants, frequenters, firefighters, etc., the variance request will be denied. NOTE: A SEPARATE PETITION IS REQUIRED FOR EACH BUILDING AND EACH CODE ISSUE PETITIONED (i.e., window issue cannot be processed on the same petition as stair issue). It should be noted that a petition for variance does not take the place of any required plan review submittal.
The division is unable to process petitions for variance that are not properly completed. Before submitting the application, the following items should be checked for completeness in order to avoid delays:
  Petitioner's name (typed or printed)
  Petitioner's signature
  The application must be signed by the owner of the building or system unless a Power of Attorney is submitted.
  Notary Public signature with affixed seal
  Analysis to establish equivalency, including any pictures, illustrations or sketches of the existing and proposed conditions to clearly convey your proposal to the reviewer.
  Proper fee
  Any required position statements by fire chief or municipal official
  A position statement from the chief of the local fire department is required for fire or life-safety issues. No fire department position statement is required for topics such as plumbing, private onsite sewage systems, or energy conservation. Submit a municipal building inspection department position for SPS 316 electrical petitions, or if SPS 361-366 commercial building plan review is by the municipality or orders are written on the building under construction. (Submit a copy of the orders.) For rules relating to one- and two-family dwellings, only a position statement is required only if the local municipality is the enforcing body. Position statements must be completed and signed by the appropriate fire chief or municipal enforcement official. Signatures or seals on all documents must be originals. Photocopies are not acceptable.