Option 3: No Change to current rule: use of PVC casing allowed for wells terminating in unconsolidated formations only, and cement grout allowed only for flowing wells.
Accessibility
For the hearing or visually impaired, non-English speakers, or those with other personal circumstances which might make communication at the meeting/hearing difficult, DNR will, to the maximum extent possible and with reasonable advance notice, provide aids including an interpreter, or a non-English, large-print, or recorded version of hearing documents. To access these resources, please contact the email address or phone number listed below as soon as possible.
Appearances at the Hearing and Submittal of Written Comments
The public has the opportunity to testify at the hearing. To register and join the hearing online or by phone, use the information provided above. Pre-registration is also available and is strongly encouraged if you plan to provide spoken comments during the hearing. To pre-register, either use the Zoom link above or download and complete the fillable Hearing Appearance form and send it to DNRNR812PublicComments@wisconsin.gov.
Comments on the proposed rule must be received on or before October 14, 2021. Written comments may be submitted by U.S. mail, E-mail, or through the internet and will have the same weight and effect as oral statements presented at the public hearing. Written comments and any questions on the proposed rules should be submitted to:
Frank Fetter – DG/5
Bureau of Drinking Water and Groundwater
Department of Natural Resources,
101 S. Webster Street
Madison, WI 53703
(608) 264-6139
The rule may be reviewed, and comments made at: http://docs.legis.wisconsin.gov/code/chr/hearings.
Initial Regulatory Flexibility Analysis:
This rule provides a major net benefit to small businesses impacted by the rule. The department assumed that a majority, if not all, of the entities impacted by this rule are small businesses. Based on this assumption the total economic impact (compliance and implementation) of this rule is expected to be incurred by small business. The total economic impact is estimated to be a one-time compliance cost of $62,500 (Level 2 Moderate).
Rule revision will recognize modern construction methods and provide more well construction options for businesses and the well owner. The revised rule is anticipated to provide increased potential for cost savings to well owners of an estimated $893,095 per year for wells constructed using thermoplastic, rather than steel, casing.
Agency Small Business Regulatory Coordinator:
Emma Esch (608) 266-1959
Loading...
Loading...
Links to Admin. Code and Statutes in this Register are to current versions, which may not be the version that was referred to in the original published document.