AB499-engrossed,17,3
1(b) If the department provides a notice under par. (a), the applicant shall
2supplement the application by providing the specified information. The application
3is complete when the applicant provides the information.
AB499-engrossed,17,84
(c) If the department determines that the issuance of an approval is contingent
5upon the issuance of a permit under s. 29.604 (6m), and if the application for the
6permit under s. 29.604 (6m) is filed with the approval application, the department
7may not determine that the approval application is incomplete on the basis that the
8department has not yet issued the permit under s. 29.604 (6m).
AB499-engrossed,17,14
9(9) (a) A person who intends to engage in bulk sampling shall submit with the
10bulk sampling plan a bond in the amount of $5,000 that is conditioned on faithful
11performance of the requirements of this section, that is issued by a surety company
12licensed to do business in this state, and that provides that the bond may not be
13canceled by the surety, except after not less than 90 days' notice to the department
14in writing by registered or certified mail.
AB499-engrossed,17,1915
(b) If the surety for a bond submitted under par. (a) issues a cancellation notice,
16the person who filed the bulk sampling plan shall deliver a replacement bond at least
1730 days before the expiration of the 90-day notice period. If the person fails to submit
18a replacement bond, the person may not engage in bulk sampling until the person
19submits a replacement bond.
AB499-engrossed,17,2420
(c) If the license of the surety company for a bond submitted under par. (a) is
21revoked or suspended, the person who filed the bulk sampling plan, within 30 days
22after receiving written notice from the department, shall deliver a replacement bond.
23If the person fails to submit a replacement bond, the person may not engage in bulk
24sampling until the person submits a replacement bond.
AB499-engrossed,18,4
1(d) The department may require that the amount of the bond submitted under
2this subsection be increased at any time, if the department determines that it is
3unlikely that the bond would be adequate to fund the cost to this state of completing
4the revegetation plan.
AB499-engrossed,18,85
(e) The department shall release a bond submitted under this subsection one
6year after the time for completing the bulk sampling and the revegetation set forth
7in the bulk sampling plan if the department determines that the person who engaged
8in bulk sampling has complied with this section.
AB499-engrossed,18,13
9(10) Notwithstanding any provision in ch. 23, 29, 30, 31, 169, 281, 283, 285,
10289, or 291 or a rule promulgated under those chapters applicable to an approval
11identified under sub. (4) or (4m), the department shall require the bulk sampling
12activity for which the approval is issued to be conducted at locations that result in
13the fewest overall adverse environmental impacts.
AB499-engrossed,18,17
14(11) (a) In determining whether to approve or deny an application for an
15approval identified under sub. (4) or (4m), the department shall consider the
16site-specific erosion control plan, the revegetation plan, and any wetland mitigation
17program.
AB499-engrossed,18,2018
(b) The department may modify the application for an approval identified
19under sub. (4) or (4m) in order to meet the requirements applicable to the approval,
20and, as modified, approve the application.
AB499-engrossed,18,25
21(12) Notwithstanding any inconsistent period in ch. 23, 29, 30, 31, 169, 281,
22283, 285, 289, or 291 or in a rule promulgated under those chapters that is applicable
23to an approval identified under sub. (4) or (4m), the department shall approve or deny
24an application within 30 days after the day on which the application is considered
25to be complete under sub. (8) if any of the following applies:
AB499-engrossed,19,3
1(a) The application is for a waiver, exemption, or exception to an approval for
2a bulk sampling activity or for a determination that the proposed bulk sampling
3activity is below the threshold that requires an approval.
AB499-engrossed,19,54
(b) The application is for a determination of eligibility for coverage or
5authorization to proceed under a general permit or a registration permit.
AB499-engrossed,19,13
6(13) (a) Notwithstanding any inconsistent period in ch. 23, 29, 30, 31, 169, 281,
7283, 285, 289, or 291 or in a rule promulgated under those chapters that is applicable
8to an approval identified under sub. (4) or (4m), the department shall approve or deny
9any application for an approval identified under sub. (4) or (4m) to which sub. (12)
10does not apply within 60 days after the date on which the application is considered
11to be complete under sub. (8), unless the application is for an individual permit for
12which federal law requires the opportunity for public comment or the ability to
13request a public hearing prior to issuance of the approval.
AB499-engrossed,19,2314
(b) The department shall publish a class 1 notice, under ch. 985, and shall
15publish notice on the department's Internet site, that describes the availability of
16information concerning the activity for which an approval described in par. (a) is
17required, its proposed decision, its draft approval, information or summaries related
18to the approval, the department's analyses and preliminary determinations relating
19to the approval, any additional information that a law concerning the approval
20requires to be made available, and the opportunity to submit written comments
21within 30 days after the date of the publication of the notice. The date on which the
22department first publishes the notice on its Internet site shall be considered the date
23of the publication of the notice required to be published under this paragraph.
AB499-engrossed,20,624
(c) In the notice under par. (b), the department shall also specify the date, time,
25and location of the public informational hearing under par. (e). The department shall
1send the notice to any person to whom the department is required to give notice of
2any proposed determination, application, or hearing concerning an approval
3described in par. (a) under the laws relating to the issuance of the approval and to
4any person who has requested notice. The department's notice to interested persons
5under this paragraph may be given through an electronic notification system
6established by the department.
AB499-engrossed,20,137
(d) If there is more than one approval described in par. (a), the department shall
8issue one notice and coordinate the public comment period for all of the approvals.
9If possible, the department shall coordinate the notice and the public comment
10period for an approval that is an individual permit for which federal law requires the
11opportunity for public comment or the ability to request a public hearing prior to
12issuance of the approval with notice and the public comment period for the approvals
13described in par. (a).
AB499-engrossed,20,2414
(e) The department shall hold a public informational hearing within 30 days
15after the date of the publication of the notice under par. (b). The department shall
16hold the public informational hearing in the county where the majority of the
17proposed bulk sampling site is located. If there is more than one approval described
18in par. (a), the department shall hold a single public informational hearing covering
19all of the approvals. If possible, the department shall include consideration of an
20approval that is an individual permit for which federal law requires the opportunity
21for public comment or the ability to request a public hearing prior to issuance of the
22approval in the public informational hearing under this paragraph. The public
23informational hearing under this paragraph is not a contested case hearing under
24ch. 227.
AB499-engrossed,21,7
1(14) (a) If it is not possible to coordinate the public comment period and public
2informational hearing for an approval that is an individual permit for which federal
3law requires the opportunity for public comment or the ability to request a public
4hearing prior to issuance of the approval with the public comment period and public
5informational hearing under sub. (13), the department shall issue a separate public
6notice and hold a separate public informational hearing for the approval in
7accordance with the law governing the approval.
AB499-engrossed,21,128
(b) The department shall approve or deny the application for an approval that
9is an individual permit for which federal law requires the opportunity for public
10comment or the ability to request a public hearing prior to issuance of the approval
11within 180 days after the date on which the application is considered to be complete
12under sub. (8).
AB499-engrossed,21,15
13(14m) Upon issuing all of the approvals required by the department to engage
14in bulk sampling under subs. (13) and (14), the department shall issue the applicant
15a bulk sampling license.
AB499-engrossed,21,17
16(15) An approval identified under sub. (4) or (4m) or a bulk sampling license
17is issued upon mailing and is final and effective upon issuance.
AB499-engrossed,21,20
18(16) The department is not required to prepare an environmental impact
19statement or an environmental assessment for a bulk sampling license or for an
20approval required for bulk sampling.
AB499-engrossed,21,25
21(17) The department may revoke or suspend a bulk sampling license issued
22under this section if it determines, after a hearing, that the license holder has failed
23to comply with statutes or rules of the department or with the terms of the license,
24or has failed to increase bond amounts to adequate levels as specified by the
25department.
AB499-engrossed,22,2
2293.31 (title)
Data
Preapplication notification; data collection.
AB499-engrossed,23,124
293.31
(1) Any At least 12 months before filing an application for a prospecting
5permit under s. 293.35 or a mining permit under s. 293.37, a person proposing to
6engage in a prospecting or mining project shall notify the department in writing of
7the intention to apply for a prospecting or mining permit. A person who intends to
8give notice of intent to apply for a prospecting or mining permit may, prior to
9obtaining, collecting, or generating environmental data intended to be used to
10support the permit application, submit to the department the methodology that the
11person intends to use in obtaining, collecting, or generating the data. The
12department shall review the proposed methodology and shall either inform the
13person that the proposed methodology will be accepted by the department or provide
14the person with the methodology that the department requires to be used. The
15department may assess the person submitting the proposed methodology a fee equal
16to the department's costs for reviewing the proposed methodology. If a person
17intending to submit an application for a prospecting or mining permit shall notify the
18department prior to the collection of obtains, collects, or generates data or
19information intended to be used to support
the
a prospecting or mining permit
20application
. Specific environmental data which would be pertinent to a specific
21prospecting or mining application, but which was obtained or collected or generated
22prior to the notice of intent to apply for a prospecting or mining permit, shall be
23submitted in writing to the department together with any substantiating
24background information which would assist the department in establishing the
25validity of the data. The department shall review the data and, if it concludes that
1the benefits of permitting the admission of the data outweigh the policy reasons for
2excluding it, and if the data is otherwise admissible, inform the person giving the
3notice of intent to prospect or mine that the data will be accepted by the department.
4Such exclusion shall not relate to without obtaining department approval of the
5person's methodology under sub. (4), the department may not exclude any of the data
6or information that consists of general environmental information such as soil
7characteristics, hydrologic conditions
, and air and water data contained in
8publications, maps, documents, studies, reports
, and similar sources, whether public
9or private, not prepared by or for the applicant.
Such exclusion shall likewise not
10relate to data which is otherwise admissible that is collected prior to notification
11under this subsection for purposes of evaluating another site or sites and which is
12not collected with intent to evade the provisions of this section.
AB499-engrossed,23,1614
293.31
(2) Upon receipt of notification under sub. (1), the department shall give
15public notice of the notification in the same manner as provided under s. 293.43
(3) 16(2m) (b).
AB499-engrossed,23,2518
293.31
(3) The department shall also receive and consider any comments from
19interested persons received within 45 days after public notice is given under sub. (2)
20as to the information which they believe should be requested from the person giving
21notice of intent to apply for a prospecting or mining permit and the information
22which they believe the department should seek through independent studies.
If the
23department holds a public informational hearing to receive comments from
24interested persons under this section, the hearing shall be completed within 45 days
25after public notice is given under sub. (2).
AB499-engrossed,24,182
293.31
(4) After No later than 90 days after the
receipt period for receiving and
3consideration of considering comments from interested persons
under sub. (3), the
4department shall inform the person giving notice of intent to apply for a prospecting
5or mining permit of the type and quantity of information that it then believes to be
6needed to support an application
, and
, where applicable, the methodology to be used
7in gathering information. The department shall specifically inform the person giving
8notice of intent to apply for a prospecting or mining permit of the type and quantity
9of information on the characteristics of groundwater resources in the area in which
10prospecting or mining is anticipated to occur which the department believes is
11needed to support an application
, including the information that the department
12believes should be included in the applicant's environmental impact report and the
13information that the department will need to prepare an environmental impact
14statement. The department shall also
begin informing inform the person giving
15notice of intent to apply for a prospecting or mining permit
as to of the
timely 16application date
and other filing requirements for
all other approvals, licenses
, and
17permits
, so as to facilitate the consideration of all other matters at the hearing on the
18prospecting or mining permit relating to the proposed prospecting or mining project.
AB499-engrossed,25,620
293.31
(4m) Before providing the information required under sub. (4), the
21department shall seek to enter into a memorandum of understanding with the
22applicant, the U.S. army corps of engineers, and any other federal regulatory agency
23with responsibilities related to the potential prospecting or mining operation to
24address sampling methodology and any other issue of mutual concern related to
25processing an application for a prospecting or mining permit. The memorandum
1may include an agreement between the department and the applicant relating to
2timelines, including timelines for the parties to conduct environmental studies and
3for granting or denying the prospecting or mining permit. The U.S. army corps of
4engineers, and any other federal agency that is a party to the memorandum, is not
5required to be a party to any agreement relating to timelines between the
6department and the applicant.
AB499-engrossed,25,108
293.32
(4) Subchapter VI of ch. 289 does not apply to mining waste disposed
9of in a mining waste site covered by a mining permit, except that an operator shall
10pay the fees specified in ss. 289.63 (4), 289.64 (3), and 289.67 (1) (d).
AB499-engrossed,25,1712
293.37
(5) If the department requires an applicant for a mining permit to
13conduct engineering and hydrologic modeling to assess a mining waste site's
14performance relative to compliance with applicable groundwater quality standards
15and surface water quality standards, the department may not require the applicant
16to examine a period longer than the period in which the mining waste site is proposed
17to operate plus 250 years after closure of the mining waste site.
AB499-engrossed,25,25
19293.40 Timeline for review.
(1) Subject to subs. (4) and (5), within 180 days
20after an applicant submits an application for a prospecting or mining permit, an
21environmental impact report, if required, and any applications for other approvals,
22licenses, or permits relating to the prospecting or mining operation the department
23shall review the information submitted and, if necessary, provide comments to the
24applicant and request additional information from the applicant relating to the
25proposed prospecting or mining project.
AB499-engrossed,26,6
1(2) Subject to subs. (4) and (5), if the department requests additional
2information from an applicant under sub. (1), within 90 days after the applicant
3provides additional information the department shall review the information
4submitted and, if necessary, provide comments to the applicant and request
5additional information from the applicant relating to the proposed prospecting or
6mining project.
AB499-engrossed,26,17
7(3) Subject to sub. (5), if the department requests additional information from
8an applicant under sub. (2), within 180 days after the applicant provides additional
9information the department shall prepare a draft environmental impact statement,
10a draft prospecting or mining permit, and draft approvals, licenses, or permits
11relating to the prospecting or mining operation. If the department requests
12additional information from an applicant under sub. (1) but not under sub. (2), the
13department shall prepare these draft documents within 180 days after the expiration
14of the 90-day period under sub. (2). If the department does not request additional
15information from an applicant under sub. (1) or sub. (2), the department shall
16prepare these draft documents within 180 days after the expiration of the 180-day
17period under sub. (1).
AB499-engrossed,27,3
18(4) Subject to sub. (5), if before the expiration of the 90-day period under sub.
19(2) the secretary of the department determines that the applicant has made a
20substantial modification to the mining or prospecting plan that significantly changes
21the information necessary to prepare an environmental impact statement or
22adequately review an application, the department shall notify the applicant of the
23secretary's determination and request additional information from the applicant.
24Upon the applicant's submission of additional information, the timeline under this
25section shall begin again, starting with the period described in sub. (1). A
1determination by the secretary under this subsection is not subject to administrative
2or judicial review and may be made only once during an applicant's permitting
3process.
AB499-engrossed,27,5
4(5) The department and the applicant may agree to modify all or part of the
5timeline under this section.
AB499-engrossed,27,11
6(6) The department may request additional information needed to process a
7prospecting or mining permit application or any other application for an approval,
8license, or permit related to the prospecting or mining operation after making
9requests for additional information under this section, but the department may not
10delay the application and review process based on another request for additional
11information.
AB499-engrossed,27,1413
293.43
(1) Applicability. This section
, and ch. 227 where it is not inconsistent, 14shall govern all hearings on applications for prospecting or mining permits.
AB499-engrossed,28,716
293.43
(1m) (b) Except as provided in this
paragraph section, for all
17department issued approvals, licenses
, and permits relating to prospecting or
18mining
, including solid waste feasibility report approvals and permits related to air
19and water, to be issued after April 30, 1980, the notice, hearing
, and comment
20provisions, if any, process and the time for issuance of decisions
, shall be controlled
21by this section and ss. 293.45 and 293.49.
If an applicant fails to make application
22for an approval, license or permit for an activity incidental to prospecting or mining
23in time for notice under this section to be provided, the notice and comment 24requirements, if any, shall be controlled by the specific statutory provisions with
25respect to that application. If notice under those specific statutory notice
1requirements can be given for consideration of the approval, license or permit at the
2hearing under this section, the application shall be considered at that hearing;
3otherwise, the specific statutory hearing provisions, if any, with respect to that
4application shall control. The substantive requirements for the issuance of any
5approval, permit
, or license incidental to prospecting or mining are not affected by
6the fact that a hearing on the approval, permit
, or license is conducted as part of a
7hearing under this section.
AB499-engrossed,28,1310
293.43
(2m) Public information and notice. (a) The department shall make
11available for review in the city, village, or town in which the proposed prospecting or
12mining site is located, information concerning the proposed prospecting or mining
13site, including all of the following:
AB499-engrossed,28,1514
1. The application for the prospecting or mining permit, including the mining
15plan, reclamation plan, and mining waste site feasibility study and plan of operation.
AB499-engrossed,28,1716
2. All of the following relating to an approval other than the prospecting or
17mining permit:
AB499-engrossed,28,1818
a. The application.
AB499-engrossed,28,1919
b. A draft approval.
AB499-engrossed,28,2020
c. Information or summaries relating to the draft approval.
AB499-engrossed,28,2321
3. The draft environmental impact statement, the environmental impact
22report, and any additional supporting information used in the department's
23evaluation of the proposed prospecting or mining.
AB499-engrossed,28,2424
4. The draft prospecting or mining permit.
AB499-engrossed,29,2
15. The department's analyses and preliminary determinations relating to any
2approval.
AB499-engrossed,29,143
(b) Within 30 days after the expiration of the applicable time period under s.
4293.40 (3), the department shall distribute a notice that describes the availability of
5the information under par. (a); the opportunity for written public comment, including
6an invitation for the submission of written comments by any person within 45 days
7after the date of the publication of the notice; and the date, time, and location of the
8public informational hearing and that includes any additional information that a law
9concerning any approval requires to be provided. The department shall publish the
10notice as a class 1 notice under ch. 985 and shall publish notice on the department's
11Internet site. The date on which the department first publishes the notice on its
12Internet site shall be considered the date of the publication of the notice required to
13be published under this paragraph. The department shall also send the notice to all
14of the following:
AB499-engrossed,29,1615
1. The clerk of any city, village, town, or county with zoning jurisdiction over
16the proposed prospecting or mining site.
AB499-engrossed,29,1817
2. The clerk of any city, village, town, or county within whose boundaries any
18portion of the proposed prospecting or mining site is located.
AB499-engrossed,29,2119
3. The clerk of any city, village, or town, contiguous to any city, village, or town
20within whose boundaries any portion of the proposed prospecting or mining site is
21located.
AB499-engrossed,29,2422
4. The main public library of each city, village, town, or county with zoning
23jurisdiction over the proposed mining site or within whose boundaries any portion
24of the proposed prospecting or mining site is located.
AB499-engrossed,30,2
15. Any regional planning commission for the area within which the proposed
2prospecting or mining site lies.
AB499-engrossed,30,53
6. Any state agency that the department knows is required to grant a permit
4or other authorization necessary for the construction or operation of the proposed
5prospecting or mining project.
AB499-engrossed,30,96
7. The federal environmental protection agency, U.S. army corps of engineers,
7and states potentially affected by the proposed discharge if a water discharge permit
8under ch. 283 or a wetland permit that constitutes a water quality certification as
9required by
33 USC 1341 (a) is to be considered at the public informational hearing.
AB499-engrossed,30,1210
8. The federal environmental protection agency and appropriate agencies in
11other states that may be affected if an air pollution control permit under ch. 285 is
12to be considered at the public informational hearing.
AB499-engrossed,30,1513
9. If a water withdrawal permit under s. 293.65 for a withdrawal of surface
14water is to be considered at the public informational hearing, the persons specified
15in s. 30.18 (4) (a).
AB499-engrossed,30,2116
10. If an individual permit under s. 30.12 for a structure through which water
17transferred from the Great Lakes basin would be returned to the source watershed
18through a stream tributary to one of the Great Lakes is to be considered at the public
19informational hearing, the governing body of each city, village, and town through
20which the stream flows or that is adjacent to the stream downstream from the point
21at which the water would enter the stream.
AB499-engrossed,30,2422
11. Any person upon request. The department's notice under this subdivision
23may be given through an electronic notification system established by the
24department.
AB499-engrossed,30,2525
12. The applicant.
AB499-engrossed,31,3
113. Any other person to whom the department is required to give notice of any
2proposed determination, application, or hearing concerning an approval under the
3laws relating to the issuance of any approval or under s. 1.11.
AB499-engrossed,31,94
(c) The department shall coordinate the public comment period for the
5prospecting or mining permit with the public comment period for any other approval
6for the prospecting or mining operation, except that if an application for an approval
7is filed too late to allow public comment within the public comment period for the
8prospecting or mining permit, the department shall issue separate notice, as
9described in par. (b), for the approval after the application is filed.
AB499-engrossed,32,612
293.43
(3m) Informational hearing. The department shall hold a public
13informational hearing before it approves or denies an application for a prospecting
14or mining permit and not less than 30 days after the date of the publication of the
15notice under sub. (2m) (b). The department shall hold the public informational
16hearing in the county where the majority of the proposed prospecting or mining site
17is located. The department shall hold a single public informational hearing covering
18the draft prospecting or mining permit, all other draft approvals, and the draft
19environmental impact statement, except that if an application for an approval is filed
20too late to allow the application to be considered at the public informational hearing
21for the prospecting or mining permit, the department shall hold a separate public
22informational hearing on the draft approval in the county where the majority of the
23proposed prospecting or mining site is located not less than 30 days after the date of
24the publication of a separate notice under sub. (2m) (b) for the approval. The
25department shall publish the separate notice for the approval on its Internet site not
1more than 10 days after the application is considered to be complete, which is the
230th day after the department receives the application unless, before that day, the
3department requests additional information, in which case the application is
4considered to be complete when the applicant provides the information. A public
5informational hearing under this subsection is not a contested case hearing under
6ch. 227.
AB499-engrossed,32,129
293.43
(4m) Summary. After considering the comments received under subs.
10(2m) and (3m) and before acting on the application for the mining permit, the
11department shall prepare a summary of the comments and the department's
12response to the comments.
AB499-engrossed,35
14Section
35. 293.49 (1) (a) (intro.) of the statutes is amended to read:
AB499-engrossed,32,1715
293.49
(1) (a) (intro.) Except as provided in sub. (2)
and s. 293.50 and except
16with respect to property specified in s. 41.41 (11), within 90 days of the completion
17of the public hearing record, the department shall issue the mining permit if it finds:
AB499-engrossed,32,2319
293.49
(1) (a) 2m. The technology that will be used at the proposed operation
20is capable of resulting in compliance with all applicable air, groundwater, surface
21water, and solid and hazardous waste management laws and rules of the department
22and is reasonably certain to result in compliance with these laws and rules at the
23proposed mining site.