AB770,29,44 236.13 (2) (ad) In this subsection:
AB770,29,65 1. “Binder course” means the non-surface-level course that is attached to the
6packed-level gravel course.
AB770,29,127 2. “Land disturbing activity” means any man-made alteration of the land
8surface resulting in a change in the topography or existing vegetative or
9nonvegetative soil cover, that may result in runoff and lead to an increase in soil
10erosion and movement of sediment into waters of this state. “Land disturbing
11activity” includes clearing and grubbing, demolition, excavating, pit trench
12dewatering, filling, and grading activities.
AB770,29,1513 3. “Total cost to complete a public improvement” includes the cost to make and
14install storm water facilities. “Total cost to complete a public improvement” does not
15include any of the following:
AB770,29,1616 a. Any fees charged by the governing body of the town or municipality.
AB770,29,1817 b. Land disturbing activities that are necessary to achieve the desired subgrade
18for public improvements.
AB770,56 19Section 56. 236.13 (2) (am) 1m. of the statutes is created to read:
AB770,29,2320 236.13 (2) (am) 1m. a. If the governing body of the town or municipality
21requires a subdivider to provide security under subd. 1. a., the governing body shall
22accept a performance bond or a letter of credit, or any combination thereof, at the
23subdivider's option, to satisfy the requirement.
AB770,30,424 b. The subdivider and the governing body of the town or municipality may
25agree that all or part of the requirement to provide security under subd. 1. a. may

1be satisfied by a performance bond provided by the subdivider's contractor that
2names the town or municipality as an additional obligee provided that the form of
3the contractor's performance bond is acceptable to the governing body of the town or
4municipality.
AB770,30,105 c. The governing body of a town or municipality shall accept a bond under this
6subdivision if the person submitting the bond demonstrates that the bond is
7consistent with a standard surety bond form used by a company that, on the date the
8bond is obtained, is listed as an acceptable surety on federal bonds in the most recent
9circular 570 published by the U.S. department of the treasury, as required under 31
10CFR 223.16
.
AB770,57 11Section 57. 236.13 (2) (am) 3. of the statutes is created to read:
AB770,30,1412 236.13 (2) (am) 3. a. With regard to public improvements to which subd. 1.
13applies, no town or municipality may enact an ordinance relating to the substantial
14completion of such a public improvement that is inconsistent with subd. 2.
AB770,30,1615 b. Upon such substantial completion, any outstanding local building permits
16that are related to, and dependent upon, substantial completion shall be released.
AB770,30,2317 c. The governing body of a town or municipality shall, upon a subdivider's
18request, issue a permit to commence construction of a foundation or any other
19noncombustible structure before substantial completion of a public improvement if
20all public improvements related to public safety are complete and the security
21requirement under subd. 1. a. has been met. The subdivider may not commence work
22on a building until the governing body of the town or municipality approves or issues
23a permit for the construction of the building.
AB770,58 24Section 58. 236.34 (1) (ar) 1. of the statutes is amended to read:
AB770,31,6
1236.34 (1) (ar) 1. Notwithstanding s. 236.45 (2) (ac) and (am), a municipality,
2town, or county that has established a planning agency may enact an ordinance or
3adopt a resolution that specifies a maximum number of parcels that is greater than
44 into which land that is situated in the municipality, town, or county and zoned for
5commercial, multifamily dwelling, as defined in s. 101.971 (2), industrial, or
6mixed-use development may be divided by certified survey map.
AB770,59 7Section 59. 236.45 (6) (am) of the statutes is amended to read:
AB770,31,158 236.45 (6) (am) Notwithstanding subs. (1) and (2) (ac), a municipality, town,
9or county may not, as a condition of approval under this chapter, impose any fees or
10other charges to fund the acquisition or improvement of land, infrastructure, or other
11real or personal property, except that a municipality or town may impose a fee or
12other charge to fund the acquisition or initial improvement of land for public parks
13if the fee or other charge is imposed under a subdivision ordinance enacted or
14amended in accordance with the procedures under s. 66.0617 (3) to (5) and meets the
15requirements under s. 66.0617 (6) to (10)
.
AB770,60 16Section 60. 236.45 (6) (c) of the statutes is created to read:
AB770,31,2417 236.45 (6) (c) If a subdivision ordinance of a municipality, town, or county
18requires, as a condition of approval under this chapter, that a subdivider dedicate
19land for a public park, the municipality, town, or county may offer the subdivider the
20option of either dedicating the land or paying a fee or other charge under par. (am)
21in lieu of the dedication. If the subdivider elects to pay a fee or other charge under
22this paragraph, the fee or other charge is payable by the landowner to the
23municipality, town, or county upon the issuance of a building permit by the
24municipality, town, or county.
AB770,61 25Section 61. 281.33 (6) of the statutes is repealed.
AB770,62
1Section 62. Nonstatutory provisions.
AB770,32,72 (1) Notwithstanding Section 63 (4), in any claim or action under section 32.20
3of the statutes for the determination of additional items payable that is pending,
4including any appeal, on the effective date of this subsection, the claimant shall be
5allowed 45 days to submit a revised claim to the condemnor that includes expenses
6permitted under section 32.19 (4m) (a) or (b) of the statutes, as affected by this act,
7whichever is applicable.
AB770,63 8Section 63 . Initial applicability.
AB770,32,119 (1) Local project approvals. The treatment of section 66.10015 (2) (d) and (5)
10of the statutes first applies to an approval made on the effective date of this
11subsection.
AB770,32,1512 (2) Subdivision approval conditions related to public park improvements.
13The treatment of section 236.45 (6) (am) and (c) of the statutes first applies to a
14subdivision or other division of land submitted for approval to a municipality, town,
15or county on the effective date of this subsection.
AB770,32,1916 (3) Just compensation. The treatment of section 32.09 (1m) (a) and (b) of the
17statutes first applies to an action for the determination of fair market value in a
18condemnation proceeding for which title to the subject property has not vested in the
19condemnor on the effective date of this subsection.
AB770,32,2320 (4) Relocation benefits. The treatment of sections 32.19 (2) (hm) and (4m) (a)
21(intro.) and 4. and (b) 1. and 32.20 of the statutes first applies to a claim for expenses
22filed under section 32.20 of the statutes for the determination of additional items
23payable on the effective date of this subsection.
AB770,33,3
1(5) Impact fee refunds. The treatment of section 66.0617 (9) (a), (b), (c), and
2(d) of the statutes first applies to an impact fee imposed on the effective date of this
3subsection.
AB770,33,64 (6) Uniform dwelling code; limitation on local authority. The treatment of
5section 101.65 (1c) of the statutes first applies to a contract that is entered into on
6the effective date of this subsection.
AB770,33,87 (7) Levy limit exception. The treatment of section 66.0602 (3) (m) of the
8statutes first applies to a levy that is imposed in December 2018.
AB770,33,119 (8) Zoning amendment protest. The treatment of section 62.23 (7) (d) 2m. a.
10of the statutes first applies to a zoning ordinance amendment adopted on the
11effective date of this subsection.
AB770,64 12Section 64. Effective dates. This act takes effect on the day after publication,
13except as follows:
AB770,33,1514 (1) The treatment of section 66.10013 of the statutes takes effect on January
151, 2019.
AB770,33,1616 (End)