NR 439.055 (1m) The department may require the owner or operator of a source to install and operate instrumentation to monitor the operation of the source or of and air pollution control equipment. Unless otherwise specified by the department, for the following types of air pollution control equipment, the indicated operational variables shall, at a minimum, be monitored:
47Section 47 NR 439.055 (1) (a) to (g) are repealed. 48Section 48 NR 439.055 (1e) and (1s), are created to read: NR 439.055 (1e) In this section, “accuracy” or “accurate” means the closeness of an indicator or reading of a measurement device to the actual value of the quantity being measured; usually expressed as ± percent of the full-scale output or reading.
(1s) The department may require, in an operation permit, the installation and operation of instrumentation to monitor the operation of the source and air pollution control equipment to meet the requirements under s. NR 407.09 (1) (c) 1. and (4) (a) 1. 49Section 49 NR 439.055 (2) is repealed. 50Section 50 NR 439.055 (2m) is created to read: NR 439.055 (2m) The department may require, in an air pollution control permit or order, the measurement of source or air pollution control operational variables if the department determines that these requirements are necessary to ensure that the source does not exceed an applicable emission limit or to ensure that the requirements of chs. NR 400 to 499, standards of performance for new stationary sources under section 111 of the Act (42 USC 7411), or emission standards for hazardous air contaminants under section 112 of the Act (42 USC 7412) are met. 51Section 51 NR 439.055 (3) (a) to (c) are amended to read: NR 439.055 (3) (a) The temperature monitoring device shall have an accuracy of 0.5% percent of the temperature being measured in degrees Fahrenheit or ± 5°F of the temperature being measured, or the equivalent in degrees Celsius (centigrade), whichever is greater.
(b) The pressure drop monitoring device shall be accurate to within 5% percent of the pressure drop being measured or within ±1 inch of water column, whichever is greater.
(c) The current, voltage, flow or pH monitoring device shall be accurate to within 5% percent of the specific variable being measured.
52Section 52 NR 439.055 (3) (d) is created to read: NR 439.055 (3) (d) Unless otherwise specified by the department, all other parameter monitoring devices shall be accurate to within 5 percent of the specific variable being measured.
53Section 53 NR 439.055 (4) is amended to read: NR 439.055 (4) All instruments used for measuring source or air pollution control equipment operational variables shall be calibrated yearly or at a frequency based on good engineering practice as established by operational history, whichever is more frequent., replaced, or validated at a frequency required by an applicable federal requirement, or, if there is no minimum frequency required by an applicable federal requirement, calibrations, replacements, or validations shall be at least as frequent as one of the following:
(a) Yearly.
(b) A frequency based on written manufacturer recommendations.
(c) A frequency established by operational history that demonstrates compliance with the instrument accuracy requirements under sub. (3).
54Section 54 NR 439.055 (5) is repealed. 55Section 55 NR 439.055 (5m) is created to read: NR 439.055 (5m) The owner or operator shall maintain records of the accuracy and calibrations, replacements, and validations for all instruments used for measuring source or air pollution control equipment operational variables, including the date the calibration, replacement, or validation was conducted and the accuracy of the monitoring device in percent of the variable being measured.
56Section 56 NR 439.055 (6) is repealed. 57Section 57 NR 439.055 (6m) is created to read: (6m) No person may render inaccurate any monitoring device or method required under this chapter or in an air pollution control permit.
58Section 58 NR 439.06 (intro.), (1), (1m), (2) (a) and (b), and (3) (a) and (c) are amended to read: _Hlk136500293 NR 439.06 Methods and procedures for determining compliance with emission limitations (by air contaminant). When tests or a continuous monitoring system are required by the department, the owner or operator of a source shall use the reference methods listed in under this section and in under ss. NR 439.07 to 439.095 to determine compliance with emission limitations, unless an alternative or equivalent method is approved, or a specific method is required, in writing, by the department. Any alternative, equivalent, or other specific method approved or required by the department for an ozone precursor shall be submitted to, and will not become effective for federal purposes until approved by, the administrator or designee as a source-specific revision to the department's state implementation plan for ozone. The test methods shall include quality control and quality assurance procedures and the data reporting format which that are specified and approved by the department for collection, analysis, processing, and reporting of compliance monitoring data. Notwithstanding the compliance determination methods which the owner or operator of a source is authorized to use under this chapter, the department may use any relevant information or appropriate method to determine a source's compliance with applicable emission limitations. Nothing in this chapter shall preclude the use, including the exclusive use, of any credible evidence or information, relevant to whether a source would have been in compliance with applicable requirements. (1) Nonfugitive particulate matter emissions. The owner or operator of a source shall use Method 5, 5A, 5B, 5D, 5E, 5F, 5G, 5H, 5I, or 17 in 40 CFR part 60, Appendix A, incorporated by reference in under s. NR 484.04 (13), and when required, Method 202 in 40 CFR part 51, Appendix M, incorporated by reference in under s. NR 484.04 (9), to determine compliance with a nonfugitive particulate matter emission limitation. (1m) Nonfugitive PM10 particulate emissions. The owner or operator of a source shall use Method 201 or 201A and 202 in 40 CFR part 51f, Appendix M, incorporated by reference in under s. NR 484.04 (9), to determine compliance with a nonfugitive PM10 particulate matter emission limitation. (b) Install, calibrate, maintain, and operate a continuous emission monitor that meets the applicable performance specifications in under 40 CFR part 60, Appendix Appendices B and F or, for affected units, the performance specifications in under 40 CFR part 75, Appendices A to I, incorporated by reference in under s. NR 484.04 (21), (21m), and (27). The owner, or operator, or designee of the source shall submit a quality control and quality assurance plan for approval by the department. The monitor shall follow the plan, as approved by the department. _Hlk146896580(3) (a) Method 18, 25, 25A, or 25B, or 320 in 40 CFR part 60, Appendix A, incorporated by reference in under s. NR 484.04 (13), or ASTM D6348-12 (2020), incorporated by reference under s. NR 484.10 (55r), shall be used to determine organic compound emission concentrations or emission rates. (c) Method 21 in 40 CFR part 60, Appendix A, incorporated by reference in under s. NR 484.04 (13), shall be used to detect organic compound emission leaks except as provided in par. (i) 2. or 3. 59Section 59 NR 439.06 (3) (c) (Note) is repealed. 60Section 60 NR 439.06 (4) (b), (5), (6) (a) and (b), (7) (b), and (9) (a) 2. are amended to read: (4) (b) Install, calibrate, maintain, and operate a continuous emission monitor that meets the applicable performance specifications in 40 CFR part 60, Appendix Appendices B and F, incorporated by reference in under s. NR 484.04 (21) and (21m), and follow quality control and quality assurance procedures for the monitor, which have been submitted by the owner or operator of the source and approved by the department. (5) Lead emissions. The owner or operator of a source shall use Method 12 or 29 in 40 CFR part 60, Appendix A, incorporated by reference in under s. NR 484.04 (13), to determine compliance with a lead emission limitation. (6) (a) Method 7, 7A, 7B, 7C, 7D, or 7E, or 320 in 40 CFR part 60, Appendix A, incorporated by reference in under s. NR 484.04 (13), or ASTM D6348-12 (2020), incorporated by reference under s. NR 484.10 (55r). (b) Install, calibrate, maintain, and operate a continuous emission monitor that meets the applicable performance specifications in 40 CFR part 60, Appendix Appendices B and F, or, for affected sources, the performance specifications in 40 CFR part 75, Appendices A to I, incorporated by reference in under s. NR 484.04 (21), (21m), and (27). The owner, or operator, or designee of the source shall submit and follow the quality control and quality assurance plan for the monitor, which has been approved by the department. (7) (b) Install, calibrate, maintain, and operate a continuous emission monitor that meets the applicable performance specifications in 40 CFR part 60, Appendix Appendices B and F, incorporated by reference in under s. NR 484.04 (21) and (21m), and follow quality control and quality assurance procedures for the monitor, which have been submitted by the owner or operator of the source and approved by the department. (9) (a) 2. Install, calibrate, maintain, and operate a continuous emission monitor that meets the applicable performance specifications in 40 CFR part 60, Appendix Appendices B and F or 40 CFR part 75, Appendices A to I, incorporated by reference in under s. NR 484.04 (21), (21m), and (27), and follow a quality control and quality assurance plan for the monitor, which has been approved by the department. _Hlk113453088Section 61 NR 439.07 (1) and (2) are repealed and recreated to read: NR 439.07 (1) General. All emission tests conducted for the purpose of determining compliance with an emission limitation under chs. NR 400 to 499, standards of performance for new stationary sources under section 111 of the Act (42 USC 7411), or emission standards for hazardous air contaminants under section 112 of the Act (42 USC 7412), shall be performed according to the test methods established in 40 CFR part 60, Appendix A, 40 CFR part 61, Appendix B, and 40 CFR part 63, Appendix A, incorporated by reference under s. NR 484.04 (13), (23), and (25), or according to other test methods approved in writing by the department. The owner or operator of a source, or a contractor responsible for emission testing, shall follow the procedures in this section. All compliance emission tests shall be performed with the equipment operating at capacity or as close to capacity as practicable or under other conditions as specified in an applicable requirement or approved by the department. (2) Emission test notification and test plan submittal. The owner, operator, or designee of a source shall notify the department in writing at least 30 calendar days in advance of a compliance emission test, including initial certification tests and relative accuracy tests performed under s. NR 439.09, to provide the department an opportunity to have a representative present to witness the testing procedures. The notice shall provide a test plan that includes all of the following information for the emissions unit to be tested: (a) A description of the reference test methods, analytical test methods, and quality assurance and quality control procedures to be used.
(am) A description of any planned or anticipated reference method or analytical test method deviation and a copy of any reference method or analytical test method deviation approval.
(b) A description of each emissions unit, including fuel types and maximum design capabilities.
(c) A description of the emissions unit operating parameters and an explanation of how the emissions unit will be operated during the test.
(cm) A description of the control device associated with each emissions unit.
(cp) A description of the control device operating parameters and an explanation of how the control device will be monitored during the test.
(d) The proposed test date, starting time of the test, and test schedule.
(dm) The expected duration and number of sampling runs for each reference test method.
(e) A description of the number and location of the sampling ports and sampling points including a diagram showing the distance of the sampling ports from the nearest upstream and downstream flow disturbances and the stack dimensions for each measurement location.
(f) A statement indicating the production rate and the operating conditions at which the test will be conducted.
(g) Facility name, physical address, city, state, and zip code.
(h) Facility contact name and phone number.
(i) Facility identification number and active permit numbers.
(j) Stack numbers, emissions unit numbers, and control device numbers.
(k) Pollutant emission limitations.
(L) List of the applicable rules, orders, and permit conditions requiring the test.
(m) Test firm name, address, city, state, and zip code.
(n) Test firm contact name and phone number.
62Section 62 NR 439.07 (3) (intro.), (4), (5) (a), (7) (intro.), and (8) (a) 1., (b), and (e) are amended to read: NR 439.07 (3) Test plan evaluation. In evaluating the test plan, the department shall respond to the source owner or operator within 10 business14 calendar days of receipt of the plan and if amendments are needed. If the department does not respond within 14 calendar days, the test may proceed as described in the test plan. The department may require any of the following:
(4) Notification of test plan revision. The source owner, or operator, or designee of a source shall notify the department of any modifications to the test plan at least 5 business7 calendar days prior to the test. In the event the owner or operator is unable to conduct the compliance emission test on the date specified in the test plan, due to unforeseeable circumstances beyond the owner or operator's control, the owner or operator of a source shall notify the department at least 5 business7 calendar days prior to the scheduled compliance emission test date and specify the date when the test is rescheduled or arrange a rescheduled date with the department.
(5) (a) The installation of sampling ports and safe sampling platforms meeting the requirements of EPA Method 1.
(7) Emission testing equipment calibration requirements. The following components of any emission sampling train or associated sampling equipment shall be calibrated not more than 60 calendar days before the test:
(8) (a) 1. The gas flow rate, in dry standard cubic feet per minute, shall be determined during each repetition of an emission test using Method 1, 1A, 2, 2A, 2B, 2C, 2D, 2E, 2F, 2G, 2H, 3, 3A, 3B, 3C, and 4 in 40 CFR part 60, Appendix A, incorporated by reference in under s. NR 484.04 (13), as applicable. (b) Particulate matter. When compliance with a particulate matter emission limitation is determined using Method 5, 5A, 5B, 5D, 5E, 5F, 5G, 5H, 5I, or 17 in 40 CFR part 60, Appendix A, incorporated by reference in under s. NR 484.04 (13), the test shall consist of 3 representative repetitions. In addition, all of the following provisions apply: 1. Sootblowing shall be performed during one repetition of each test for particulate matter emissions on any boiler that routinely employs sootblowing, unless the boiler uses a continuous sootblowing system. If a continuous sootblowing system is operating during the test, compliance with the emission limitation shall be determined by the arithmetic mean of the results of all repetitions. If a continuous sootblowing system is not operating during the test, the representative average pounds of particulate matter emissions per million Btu heat input shall be determined by the following equation:
E = Es ((A + B) S/AR) + Ens((R - S)/R - (BS/AR))
where:
E is the weighted average pounds of particulate matter per million Btu heat input
Es is the pounds of particulate matter per million Btu heat input for test runs during sootblowing
Ens is the arithmetic average pounds of particulate matter per million Btu heat input for test runs with no sootblowing
A is the hours of sootblowing during test runs containing sootblowing
B is the hours with no sootblowing during test runs containing sootblowing
R is the average hours of boiler operation per 24 hours
S is the average hours of sootblowing per 24 hours
2. Each repetition for a particulate emissionmatter emissions test shall have a sample volume of at least 30 dry standard cubic feet.
3. Method 17, for particulates particulate matter emissions, in 40 CFR part 60, Appendix A, incorporated by reference in under s. NR 484.04 (13), may not be used where stack or duct temperatures exceed 320°F. 4. Heat input shall be equal to the fuel use rate multiplied by the heat content of the fuel on an as-fired basis. Fuels shall be analyzed for heat content using the procedures in Method 19 in 40 CFR part 60, Appendix A, incorporated by reference in under s. NR 484.04 (13). Alternately, heat input may be determined using a continuous emission monitor that meets the applicable performance specifications in 40 CFR part 60, Appendices B and F, or, for affected sources, the performance specifications in 40 CFR part 75, Appendices A to I, incorporated by reference under s. NR 484.04 (21), (21m), and (27). 5. Any boiler emission rate in pounds per million Btu heat input shall be determined using the heat input based on fuel use rate. The emission rate may be determined using the F-Factor calculation shown in Method 19 in 40 CFR part 60, Appendix A, incorporated by reference in under s. NR 484.04 (13), with written approval from the department. If the F-Factor method is used, an ultimate fuel analysis shall be performed. An integrated gas sample, using Method 3, 3A, or 3B, or 3C in 40 CFR part 60, Appendix A, incorporated by reference in under s. NR 484.04 (13), shall be collected and analyzed for oxygen and carbon dioxide content. Other methods for determining the boiler heat input may be used only if approved, in writing, by the department. 6. If cyclonic flow is a possibility at a particulate matter emission test location, a test for the presence of cyclonic flow shall be performed before the particulate matter test using the procedures in Method 1 in 40 CFR part 60, Appendix A, incorporated by reference in under s. NR 484.04 (13). If cyclonic flow is present, the flow must be straightened before testing can begin unless the source owner or operator demonstrates, to the department's satisfaction, the acceptability of the location using the alternate procedure to Method 1. If cyclonic flow is not present, testing can proceed. 7. Except for sources subject to emission testing requirements in ch. NR 440 under 40 CFR part 60, the department may require the owner or operator of a source capable of emitting condensablecondensable particulate matter, to include an analysis of the back half of the stack sampling train catch in the total particulate catch for any emission test using Method 5, 5A, 5B, 5D, 5E, 5F, 5G, 5H, 5I, or 17, in 40 CFR part 60, Appendix A, incorporated by reference in under s. NR 484.04 (13). This procedure and analysis shall be performed using Method 202 in 40 CFR part 51, Appendix M, incorporated by reference in under s. NR 484.04 (9). _Hlk146896740(e) Organic compound emissions. When compliance with an organic compound emission limitation is determined using Methods 18, 25, 25A, or 25B, or 320 in 40 CFR part 60, Appendix A, incorporated by reference in under s. NR 484.04 (13), or ASTM D6348-12 (2020), incorporated by reference under s. NR 484.10 (55r), the test shall consist of a minimum of 3 representative repetitions. 63Section 63 NR 439.07 (9) is repealed and recreated to read: (9) Emission test reporting requirements. For compliance emission tests, including initial certification tests and relative accuracy tests performed under s. NR 439.09, the owner, operator, or designee of the source tested shall submit to the department an emission test report within 60 calendar days after completion of a compliance emission test. If requested, the department may grant an extension of up to 30 calendar days for test report submittal. The failure to include any information required under this subsection in an emission test report may result in rejection of the test report submittal. The emission test report shall include all of the following information for the emissions unit tested: (a) A detailed description of each emissions unit and control device.