292.15(2)(ae)4. 4. If the voluntary party owns or controls the property, the voluntary party maintains and monitors the property as required under rules promulgated by the department and any contract entered into under those rules.
292.15(2)(ae)5. 5. The voluntary party does not engage in activities that are inconsistent with the maintenance of the property.
292.15(2)(ae)6. 6. The voluntary party has not obtained the certification under subd. 3. by fraud or misrepresentation, by the knowing failure to disclose material information or under circumstances in which the voluntary party knew or should have known about more discharges of hazardous substances than were revealed by the investigation conducted under subd. 1.
292.15(2)(ag) (ag) Property affected by off-site discharge. Except as provided in sub. (6) or (7), for a property on which there exists a hazardous substance for which a voluntary party is exempt from liability under s. 292.13 (1) or (1m), a voluntary party is exempt from the provisions of ss. 289.05 (1), (2), (3) and (4), 289.42 (1), 289.67, 291.25 (1) to (5), 291.29, 291.37, 292.11 (3), (4) and (7) (b) and (c) and 292.31 (8), and rules promulgated under those provisions, with respect to discharges of hazardous substances on or originating from the property, if the release of those hazardous substances occurred prior to the date on which the department approves the environmental investigation of the property under par. (a) 1., if par. (a) 1. and 4. to 6. apply and all of the following occur at any time before or after the date of acquisition:
292.15(2)(ag)1. 1. The environment is restored to the extent practicable with respect to the discharges and the harmful effects from the discharges are minimized in accordance with rules promulgated by the department and any contract entered into under those rules, except that this requirement does not apply with respect to the hazardous substance for which the voluntary party is exempt from liability under s. 292.13 (1) or (1m).
292.15(2)(ag)2. 2. The voluntary party obtains a certificate of completion from the department stating that the environment has been satisfactorily restored to the extent practicable with respect to the discharges and that the harmful effects from the discharges have been minimized, except with respect to the hazardous substance for which the voluntary party is exempt from liability under s. 292.13 (1) or (1m).
292.15(2)(ag)3. 3. The voluntary party obtains a written determination from the department under s. 292.13 (2) with respect to the hazardous substance for which the voluntary party is exempt from liability under s. 292.13 (1) or (1m).
292.15(2)(ag)4. 4. The voluntary party continues to satisfy the conditions under s. 292.13 (1) (d) to (g) or (1m) (d) to (g).
292.15(2)(am) (am) Partial cleanup. The department may approve a partial cleanup and issue a certificate of completion as provided in par. (a), (ae) or (ag) that states that not all of the property has been satisfactorily restored or that not all of the harmful effects from a discharge of a hazardous substance have been minimized. Approval of a partial cleanup exempts a voluntary party from ss. 291.37 (2) and 292.11 (3), (4) and (7) (b) and (c) with respect to the portion of the property or hazardous substances cleaned up under this paragraph. In addition to meeting the requirements of par. (a), (ae) or (ag), a certificate for a partial cleanup under this paragraph may be issued only if:
292.15(2)(am)1. 1. Public health, safety or the environment will not be endangered by any hazardous substances remaining on or originating from the property after the partial cleanup, given the manner in which the property will be developed and used and any other factors that the department considers relevant to the endangerment of public health, safety or the environment.
292.15(2)(am)2. 2. The activities associated with any proposed use or development of the property will not aggravate or contribute to the discharge of a hazardous substance and will not unduly interfere with, or increase the costs of, restoring the property and minimizing the harmful effects of the discharge of a hazardous substance.
292.15(2)(am)3. 3. The owner of the property agrees to cooperate with the department to address problems caused by hazardous substances remaining on the property. Such cooperation shall include allowing access to the property or allowing the department or its authorized representatives to undertake activities on the property, including placement of borings, equipment and structures on the property.
292.15(2)(ar) (ar) Condition. The department may require the owner of the property to grant an easement or other interest in the property for any of the purposes specified in par. (am) as a condition of issuing a certificate under par. (am).
292.15(2)(at) (at) Discharges discovered after environmental investigations. Except as provided in sub. (6) or (7), a voluntary party is exempt from ss. 289.05 (1), (2), (3) and (4), 289.42 (1), 289.67, 291.25 (1) to (5), 291.29, 291.37, 292.11 (3), (4) and (7) (b) and (c) and 292.31 (8), and rules promulgated under those provisions, with respect to a discharge of a hazardous substance on or originating from a property if the discharge occurred before the environmental investigation under subd. 1. is completed and if all of the following apply:
292.15(2)(at)1. 1. An environmental investigation of the property and of any discharges of hazardous substances originating from the property is conducted and is approved by the department.
292.15(2)(at)2. 2. If required by the department, the voluntary party enters into an agreement with the department under which the voluntary party agrees to conduct a cleanup approved by the department.
292.15(2)(at)3. 3. The voluntary party obtains and maintains insurance to cover the costs of complying with s. 292.11 (3) with respect to hazardous substance discharges that occurred before the investigation under subd. 1. is completed and that are discovered in the course of conducting a cleanup of the property, the insurance complies with rules promulgated by the department and the insurance names the voluntary party and this state as insureds.
292.15(2)(at)3m. 3m. If the department requires the voluntary party to enter into an agreement under subd. 2., the voluntary party conducts the agreed upon cleanup.
292.15(2)(at)4. 4. A hazardous substance discharge that occurred before the investigation under subd. 1. is completed is discovered after the investigation under subd. 1. is approved and before the cleanup is completed.
292.15(2)(at)6. 6. The voluntary party has not obtained approval of the investigation under subd. 1. or the agreement under subd. 2. by fraud or misrepresentation, by the knowing failure to disclose material information or under circumstances in which the voluntary party knew or should have known about more discharges of hazardous substances than were revealed by the investigation conducted under subd. 1.
292.15(2)(b) (b) Extent of exemptions. The exemptions provided in pars. (a), (ae), (ag) and (am) continue to apply after the date of certification by the department under par. (a) 3., (ae) 3. or (ag) 2., or approval by the department under par. (am), notwithstanding the occurrence of any of the following:
292.15(2)(b)1. 1. Statutes, rules or regulations are created or amended that would impose greater responsibilities on the voluntary party than those imposed under par. (a) 2., (ae) 2. or (ag) 1.
292.15(2)(b)2. 2. The voluntary party fully complies with the rules promulgated by the department and any contract entered into under those rules under par. (a) 2., (ae) 2. or (ag) 1. but it is discovered that the cleanup fails to fully restore the environment and minimize the effects from a discharge of a hazardous substance.
292.15(2)(b)3. 3. The contamination from a hazardous substance that is the subject of the cleanup under par. (a) 2., (ae) 2. or (ag) 1. is discovered to be more extensive than anticipated by the voluntary party and the department.
292.15(2)(b)4. 4. If the voluntary party does not own or control the property, the person who owns or controls the property fails to maintain and monitor the property as required under rules promulgated by the department or any contract entered into under those rules.
292.15(2)(c) (c) Prohibition on action. The department of justice may not commence an action under 42 USC 9607 against any voluntary party meeting the criteria of this subsection to recover costs for which the voluntary party is exempt under pars. (a), (ae), (ag), (am), (at) and (b).
292.15(2)(d) (d) Exception. This subsection does not apply to a municipal waste landfill, as defined in s. 289.01 (22), or to an approved facility.
292.15(2)(e) (e) Contract with insurer. If the department requires insurance under par. (ae) 3m. or (at) 3., the department may contract with an insurer to provide insurance required under par. (ae) 3m. or (at) 3. and may require voluntary parties to obtain coverage under the contract.
292.15(3) (3)Successors and assigns. An exemption provided in sub. (2) applies to any successor or assignee of the voluntary party if the successor or assignee complies with the provisions of sub. (2) (a) 4. and 5. or (ae) 3m., 4. and 5. and, if applicable, sub. (2) (ag) 4. or (am) as though the successor or assignee were the voluntary party except that the exemption in sub. (2) does not apply if the successor or assignee knows that a certificate under sub. (2) (a) 3., (ae) 3., (ag) 2. or (am) was obtained by any of the means or under any of the circumstances specified in sub. (2) (a) 6.
292.15(4) (4)Limited responsibility. The responsibility of a voluntary party under sub. (2) (a) 2. may be monetarily limited by agreement between the voluntary party and the department if the voluntary party purchased the property from a local governmental unit that acquired the property in a way or for a purpose described in s. 292.11 (9) (e) 1m. The agreement shall stipulate all of the following:
292.15(4)(a) (a) That the voluntary party may cease the cleanup when the cost of the cleanup equals 125% of the anticipated expense of the cleanup.
292.15(4)(b) (b) That the voluntary party will continue to receive the benefit of the exemption under sub. (2) (a) after cessation of the cleanup if the voluntary party complies with sub. (2) (a) 4. and 5.
292.15(4)(c) (c) That, if the voluntary party ceases the cleanup, the voluntary party shall use reasonable efforts to sell the property in accordance with rules of the department that define "reasonable efforts" in a manner substantively equivalent to 40 CFR 300.1100 (d) (2) (i).
292.15(5) (5)Fees. The department may, in accordance with rules that it promulgates, assess and collect fees from a voluntary party to offset the cost of the department's activities under subs. (2) and (4). The fees may include an advance deposit, from which the department shall return the amount in excess of the cost of the department's activities under subs. (2) and (4).
292.15(6) (6)Liens.
292.15(6)(a)(a) This section does not exempt property from any lien filed under s. 292.81 (3) for costs incurred by the department prior to the date that certification is issued under sub. (2) (a) 3., (ae) 3. or (ag) 2.
292.15(6)(b) (b) This section does not exempt property from any lien filed under s. 292.81 (3) for costs that are incurred by the department with respect to a hazardous substance discharge described in sub. (2) (at) 3. and that are not covered by insurance required by sub. (2) (at) 3.
292.15(7) (7)Applicability. This section does not apply to any of the following:
292.15(7)(a) (a) A hazardous waste treatment, storage or disposal facility that first begins operation after the date on which the voluntary party acquired the property.
292.15(7)(b) (b) A licensed hazardous waste treatment, storage or disposal facility operated on the property before the date on which the voluntary party acquired the property and that is operated after the date on which the voluntary party acquired the property.
292.15(7)(c) (c) Any hazardous waste disposal facility that has been issued a license under s. 144.441 (2), 1995 stats., or s. 289.41 (1m), or rules promulgated under those sections, for a period of long-term care following closure of the facility.
292.15 Annotation The Land Recycling Act. Borchert & Burke. Wis. Law. Aug. 1994.
292.15 Cross-reference Cross Reference: See also chs. NR 714, 716, 718, 720, 722, 724, 726, 750, and 754, Wis. adm. code.
292.16 292.16 Responsibility of certain municipalities acquiring closed landfills.
292.16(1) (1)Definition. In this section:
292.16(1)(a) (a) "Generator" has the meaning given in s. 292.35 (1) (b).
292.16(1)(b) (b) "Transporter" has the meaning given in s. 292.35 (1) (g).
292.16(2) (2)Application. A municipality may apply to the department for an exemption from liability with respect to property that contains a closed landfill and that is acquired by the municipality before, on or after the effective date of this subsection.
292.16(3) (3)Conditions for approval. The department shall approve an application under sub. (2) if all of the following apply:
292.16(3)(a) (a) The landfill is closed when the municipality acquires the property.
292.16(3)(b) (b) The landfill closure complies with all rules of the department at the time of the application under sub. (2).
292.16(3)(c) (c) The municipality did not have an ownership interest in the landfill while the landfill was in operation.
292.16(3)(d) (d) The municipality enters into an agreement with the department that contains requirements for the municipality to maintain the property.
292.16(3)(e) (e) The department determines that an exemption from liability under this section is in the public interest.
292.16(3)(f) (f) The landfill was privately owned while it was in operation.
292.16(3)(g) (g) The landfill has caused groundwater contamination.
292.16(3)(h) (h) A steering committee of local public and private representatives was formed to address the contamination caused by the landfill in a cooperative effort with the department that prevented the landfill from being listed on the national priority list under 42 USC 9605 (a) (8) (B).
292.16(3)(i) (i) The remedial action approved by the department authorized a recreational use for the property and was completed by December 31, 1995.
292.16(4) (4)Scope of exemption. An approval by the department under sub. (3) exempts the municipality from liability imposed under ss. 289.05, 289.41, 289.46, 289.95, 291.37, 291.85 (2), 292.11 (3), (4) and (7) (b) and (c) and 292.31 (8), and rules promulgated under those provisions, based on the municipality's ownership of the property. The exemption does not apply to any liability based on hazardous substances for which the municipality is responsible as a generator or transporter.
292.16(5) (5)Requirements. If the department approves a municipality's application under sub. (3), the municipality shall do all of the following:
292.16(5)(a) (a) Obtain the prior approval of the department for any proposed uses of the property, for any physical disturbance of the soil and for any construction on the property.
292.16(5)(b) (b) Allow access to the property by any person who is required to conduct monitoring, to operate and maintain equipment or to undertake remedial action in connection with the closed landfill.
292.16 History History: 1997 a. 27.
292.16 Cross-reference Cross Reference: See also ch. NR 708, Wis. adm. code.
292.19 292.19 Responsibility of persons conducting investigations.
292.19(1)(1) For purposes of this chapter, a person who conducts an investigation of property to determine the existence of, or to obtain information about, a discharge of a hazardous substance does not possess or control the hazardous substance or cause the discharge of the hazardous substance as the result of conducting the investigation.
292.19(2) (2) If the person who conducts the investigation physically causes a discharge, sub. (1) does not apply with respect to the portion of the property on which the person causes the discharge.
292.19 History History: 1997 a. 27.
292.21 292.21 Responsibility of lenders and representatives.
292.21(1)(1)Responsibility of lenders; lending activities; acquisition of property.
292.21(1)(a)(a) Lending.
292.21(1)(a)1.1. Subject to subd. 2. and par. (b), for purposes of this chapter, a lender does not possess or control a hazardous substance or cause the discharge of a hazardous substance as a result of engaging in lending activities.
292.21(1)(a)2. 2. Subdivision 1. does not apply in any of the following situations:
292.21(1)(a)2.a. a. A lender physically causes a discharge.
292.21(1)(a)2.b. b. The lender through tortious conduct with respect to lending activities causes a discharge of a hazardous substance or exacerbates an existing discharge of a hazardous substance.
292.21(1)(a)3. 3. The department may, by rule, designate as lending activities other activities, in addition to those listed in s. 292.01 (9), that are related to undertaking appropriate actions to preserve and protect property or are related to the advancing of funds or credit or the collecting of funds.
292.21(1)(b) (b) Preacquisition inspections of real property. For purposes of this chapter, a lender does not possess or control a hazardous substance or cause the discharge of a hazardous substance as the result of inspecting real property for compliance with environmental laws, conducting any portion of an environmental assessment of the property in the manner specified in par. (c) 2., conducting an investigation to determine the degree and extent of contamination or performing remedial action to clean the discharge of a hazardous substance. This paragraph applies to a lender only if all of the following conditions are satisfied:
292.21(1)(b)1. 1. The activities described in this paragraph occur before the date on which the lender acquires title to, or possession or control of, real property through enforcement of a security interest.
292.21(1)(b)2. 2. The lender notifies the department, in accordance with s. 292.11 (2), of any discharge of a hazardous substance identified as the result of activities described in this paragraph.
292.21(1)(b)3. 3. If the lender conducts an investigation or performs remedial action, the lender does so in accordance with department rules.
292.21(1)(b)4. 4. The lender does not physically cause a discharge.
292.21(1)(b)5. 5. The lender through tortious conduct with respect to the activities described in this paragraph does not cause a new discharge of a hazardous substance or exacerbate an existing discharge of a hazardous substance.
292.21(1)(c) (c) Acquisition of real property.
292.21(1)(c)1.1. A lender that acquires title to, or possession or control of, real property through enforcement of a security interest is not subject to s. 292.11 (3), (4) and (7) (b) and (c) and is not liable under this chapter or chs. 281, 285, 289, 291 or 293 to 299 for a discharge of a hazardous substance on that real property if all of the following conditions are satisfied:
292.21(1)(c)1.a. a. The lender, through action or inaction, does not intentionally or negligently cause a new discharge of a hazardous substance or exacerbate an existing discharge of a hazardous substance.
292.21(1)(c)1.c. c. The lender notifies the department, in accordance with s. 292.11 (2), of any known discharge of a hazardous substance.
292.21(1)(c)1.d. d. The lender conducts an environmental assessment of the real property in accordance with subd. 2. at any time, but not more than 90 days after the date the lender acquires title to, or possession or control of, the real property. The lender shall file a complete copy of the environmental assessment with the department not more than 180 days after the date the lender acquires title to, or possession or control of, the real property. If an environmental assessment is conducted more than one year before the date on which the lender acquires title to, or possession or control of, the real property, the exemption under this subd. 1. d. applies only if the lender does all of the following: visually inspects the property in accordance with subd. 2. a. and b. after the date on which the lender acquires title to, or possession or control of, the real property to verify the environmental assessment; submits a complete copy of the environmental assessment and the results of the visual inspection to the department not later than 90 days after the lender acquires title to, or possession or control of, the real property; receives notice from the department that the department determines that the environmental assessment is adequate or that the department directs the lender to address any inadequacies in the environmental assessment; corrects, to the satisfaction of the department, any inadequacies of an environmental assessment; and reimburses the department for the cost to the department of reviewing materials submitted under this subd. 1. d.
292.21(1)(c)1.e. e. For a hazardous substance released on or after the date on which the lender acquires title to, or possession or control of, the real property, the lender is not engaged in the operation of a business at the property, completion of work in progress or other actions associated with conducting the conclusion of the borrower's business.
Loading...
Loading...
This is an archival version of the Wis. Stats. database for 2001. See Are the Statutes on this Website Official?