30.207(3)(b) (b) Upon the request of a prospective applicant specified in par. (a), and before an application is submitted, the department shall meet with the prospective applicant, and other interested persons as determined by the prospective applicant or the department, to make a preliminary analysis of the likelihood that the department will issue the general permit.
30.207(3)(c) (c) An application for a general permit under this section shall include all of the following:
30.207(3)(c)1. 1. The name, legal address and telephone number of each applicant.
30.207(3)(c)2. 2. A U.S. geological survey map or similar map that has a scale of not less than one inch per 2,000 feet and that shows the proposed permit area.
30.207(3)(c)3. 3. A general legal description to quarter-quarter section of the proposed permit area.
30.207(3)(c)4. 4. A diagram to scale showing the activity proposed for the general permit with contours and cross-section profiles that show a representative example of existing conditions and a representative example of any alteration to navigable waters or the adjacent lands that may result from the activity.
30.207(3)(c)5. 5. Topographic, bathymetric, soil or other maps, photographs or other data to demonstrate the characteristics of the proposed permit area if the maps, photographs or data are reasonably available.
30.207(3)(c)6. 6. The names and addresses of at least 5 persons who own real property adjacent to the navigable waters located in the proposed permit area. If fewer than 5 persons own real property adjacent to such waters, the application shall include the names and addresses of all of these persons.
30.207(3)(d) (d) The department shall respond to the application in writing within 90 business days after receiving the application. In its response the department shall do either of the following:
30.207(3)(d)1. 1. Deny the application and specify the reason for the denial.
30.207(3)(d)2. 2. Specify the department's plans for proceeding on the application.
30.207(4) (4)Environmental analysis; hearing; consultation. After receiving an application that the department does not deny under sub. (3) (d) 1. and before determining whether to issue the general permit, the department shall do all of the following:
30.207(4)(a) (a) Conduct an environmental analysis.
30.207(4)(c) (c) Consult with any of the following as the department considers appropriate:
30.207(4)(c)1. 1. Any local entity, as defined in s. 30.77 (3) (dm), that has an interest in the quality or use of or that has jurisdiction over the navigable waters located in the proposed permit area.
30.207(4)(c)2. 2. Any contractor who is or has been involved in the construction of structures or improvements in or along navigable waters located in the proposed permit area.
30.207(4)(c)3. 3. Any riparian owners whose property rights may be affected by the issuance of the general permit.
30.207(4)(c)4. 4. Any other interested party, as determined by the department or the applicant.
30.207(6) (6)Issuance of general permits.
30.207(6)(a)(a) The department shall issue a general permit under this section if the department determines that the cumulative adverse environmental impact of the activity in the proposed permit area is insignificant and that the issuance of the general permit will not injure public rights or interest, cause environmental pollution, as defined in s. 299.01 (4), or result in material injury to the rights of any riparian owners.
30.207(6)(b) (b) The standards for the activity contained in a general permit issued under this section shall supersede any conflicting standards required under this chapter for the activity.
30.207(7) (7)Activities under general permits.
30.207(7)(a)(a) At least 15 days before beginning the activity that is authorized by a general permit under this section the person who wishes to conduct the activity shall submit a notice to the department and shall pay the fee specified in s. 30.28 (2) (b) 2. The notice shall describe the activity, state the name of the person that will be conducting the activity and state the site where the activity will be conducted. The notice shall also contain a statement signed by the person conducting the activity that the person will act in conformance with the standards contained in the general permit.
30.207(7)(b) (b) Upon receipt of a notice that complies with par. (a), the department may inform the person that the activity may not be conducted under the general permit if conditions at the site where the activity would be conducted would cause adverse environmental impact, injure public rights and interests or cause environmental pollution, as defined in s. 299.01 (4). The department shall respond to the person within 15 days after receiving the notice. Failure of the department to respond within 15 days shall constitute the department's approval of the activity under the general permit.
30.207(7)(c) (c) A person conducting an activity that is authorized by a general permit under this section shall comply with any applicable local ordinances.
30.207(8) (8)Option to request individual permits. A person proposing an activity for which a general permit has been issued under this section may apply for an individual permit under this chapter in lieu of seeking authorization under the general permit. A person proposing an activity for which a general permit has not been issued under this section may apply for an individual permit under this chapter.
30.207(9) (9)Access to property. For inspection purposes, an employee or agent of the department shall have free access during reasonable hours to any site where an activity is proposed to be, is or has been authorized under a general permit issued under this section if the employee or agent shows to any person who is present at the site and who owns the site or is otherwise in control of the site either of the following:
30.207(9)(a) (a) For an employee of the department, proper identification issued by the department.
30.207(9)(b) (b) For an agent who is not an employee of the department, written documentation that the agent is authorized by the department to have access for inspection purposes.
30.207(10) (10)Sunset. The department may not issue any further general permits under this section on or after the date on which 5 years have lapsed after the effective date of the first general permit issued under this section.
30.207 History History: 1997 a. 174; 2001 a. 16, 103; 2003 a. 118.
30.208 30.208 Applications for individual permits and contracts; department determinations.
30.208(1) (1)Application required. A person who seeks to obtain or modify an individual permit under this subchapter or to enter into a contract under s. 30.20 shall submit an application to the department. The application may contain a request for a public hearing on the application.
30.208(2) (2)Procedure for completing applications. In issuing individual permits or entering contracts under this subchapter, the department shall initially determine whether a complete application for the permit or contract has been submitted and, no later than 30 days after the application is submitted, notify the applicant in writing about the initial determination of completeness. If the department determines that the application is incomplete, the notice shall state the reason for the determination and the specific items of information necessary to make the application complete. An applicant may supplement and resubmit an application that the department has determined to be incomplete. There is no limit on the number of times that an applicant may resubmit an application that the department has determined to be incomplete under this section. The department may not demand items of information that are not specified in the notice as a condition for determining whether the application is complete unless both the department and the applicant agree or unless the applicant makes material additions or alterations to the activity or project for which the application has been submitted. The rules promulgated under s. 299.05 apply only to applications for individual permits or contracts under this subchapter that the department has determined to be complete.
30.208(3) (3)Notice of complete application; request for public hearing; decision.
30.208(3)(a)(a) Upon determination by the department that an application submitted under sub. (1) is complete, the department shall provide notice of complete application to interested and potentially interested members of the public, as determined by the department. The department shall provide the notice within 15 days after the determination that the application is complete. If the applicant has requested a public hearing as part of the submitted application, a notice of public hearing shall be part of the notice of complete application.
30.208(3)(b) (b) If the notice of complete application does not contain a notice of public hearing, any person may request a public hearing in writing or the department may decide to hold a public hearing without a request being submitted if the department determines that there is a significant public interest in holding a hearing.
30.208(3)(c) (c) A request for a public hearing under par. (b) must be submitted to the department or the department's decision to hold a public hearing must occur within 30 days after the department completes providing the notice of complete application. The department shall provide notice of public hearing within 15 days after the request for public hearing is submitted or the department makes its determination.
30.208(3)(d) (d) The department shall hold a public hearing within 30 days after the notice of hearing has been provided under par. (a) or (c).
30.208(3)(e) (e) Within 30 days after the public hearing is held or, if no public hearing is held, within 30 days of the 30-day comment period under sub. (4) (a), the department shall render a decision, issuing, denying, or modifying the permit or approving the contract that is the subject of the application submitted under sub. (1).
30.208(4) (4)Public comment.
30.208(4)(a)(a) The department shall provide a period for public comment after the department has provided a notice of complete application under sub. (3) (a), during which time any person may submit written comments with respect to the application for the permit or contract. The department shall retain all of the written comments submitted during this period and shall consider all of the comments in the formulation of the final decision on the application. The period for public comment shall end on the 30th day following the date on which the department completes providing the notice of complete application, except as provided in par. (b).
30.208(4)(b) (b) If a public hearing is held, the period for public comment shall end on the 10th day following the date on which the public hearing is completed.
30.208(4)(d) (d) The department shall promulgate rules to establish procedures for the conduct of public hearings held under this subsection. Notwithstanding s. 227.42, a public hearing held under this subsection shall be an informational hearing and may not be treated as, nor converted to, a contested case under s. 227.01 (3).
30.208(5) (5)Notice requirements.
30.208(5)(a)(a) The department shall, by rule, establish procedures for providing notices of complete applications and notices of public hearings to be provided under sub. (3), and notices of administrative hearings to be provided under s. 30.209 (1m). The procedures shall require all of the following:
30.208(5)(a)1. 1. That the notice be published as a class 1 notice under ch. 985.
30.208(5)(a)2. 2. That the notice be mailed to any person or group upon request.
30.208(5)(b) (b) The department shall, by rule, prescribe the form and content of notices of complete applications and notices of public hearings to be provided under sub. (3), and notices of administrative hearings to be provided under s. 30.209 (1m). Each notice shall include all of the following information:
30.208(5)(b)1. 1. The name and address of each applicant or permit holder.
30.208(5)(b)2. 2. A brief description of each applicant's activity or project that requires the permit.
30.208(5)(b)3. 3. The name of the waterway in or for which the activity or project is planned.
30.208(5)(b)4. 4. For a notice of complete application and a notice of public hearing under sub. (3), a statement of the tentative determination to issue, modify, or deny a permit for the activity or project described in the application.
30.208(5)(b)5. 5. For a notice of complete application and a notice of public hearing under sub. (3), a brief description of the procedures for the formulation of final determinations, including a description of the comment period required under sub. (4).
30.208(5)(c) (c) The department may delegate the department's requirement to provide notice under sub. (3) or s. 30.209 (1m) by doing any of the following:
30.208(5)(c)1. 1. Requiring that the applicant for the permit or contract provide by publication, mailing, or other distribution one or more of the notices.
30.208(5)(c)2. 2. That the applicant for the permit or contract pay for the publication, mailing, or any other distribution costs of providing one or more of the notices.
30.208 History History: 2003 a. 118 ss. 6, 149.
30.209 30.209 Contracts and individual permits; administrative and judicial review.
30.209(1) (1)Definition. In this section, "applicant" means any person applying to receive a permit or contract under this subchapter or any person who has received a permit or contract under this subchapter.
30.209(1m) (1m)Request for administrative review.
30.209(1m)(a)(a) Any interested person may file a petition with the department for administrative review within 30 days after any of the following decisions given by the department:
30.209(1m)(a)1. 1. The issuance, denial, or modification of any individual permit issued or contract entered into under this subchapter.
30.209(1m)(a)2. 2. The imposition of, or failure to impose, a term or condition on any individual permit issued or contract entered into under this subchapter.
30.209(1m)(b) (b) If the petitioner is not the applicant, the petition shall describe the petitioner's objection to the permit or contract and shall contain all of the following:
30.209(1m)(b)1. 1. A description of the objection that is sufficiently specific to allow the department to determine which provisions of this subchapter may be violated if the proposed activity or project under the permit or contract is allowed to proceed.
30.209(1m)(b)2. 2. A description of the facts supporting the petition that is sufficiently specific to determine how the petitioner believes the activity or project, as proposed, may result in a violation of the provisions of this subchapter.
30.209(1m)(b)3. 3. A commitment by the petitioner to appear at the administrative hearing and present information supporting the petitioner's objection.
30.209(1m)(c) (c) The activity or project shall be stayed pending an administrative hearing under this section, if the petition contains a request for the stay showing that a stay is necessary to prevent significant adverse impacts or irreversible harm to the environment.
30.209(1m)(d) (d) If a stay is requested under par. (c), the stay shall be in effect until either the department denies the request for an administrative hearing or the hearing examiner determines that the stay is not necessary.
30.209(1m)(e) (e) The petitioner shall file a copy of the petition with the department. If the petitioner is not the applicant, the petitioner shall simultaneously provide a copy of the petition to the applicant. The applicant may file a response to the petition with the department. If the applicant files a response under this paragraph, it shall be filed within 15 days after the petition is filed.
30.209(1m)(f) (f) The department shall grant or deny the petition within 30 days after the petition is filed. The failure of the department to dispose of the petition within this 30-day period is a denial. The department shall deny the petition if any of the following applies:
30.209(1m)(f)1. 1. The petitioner is not the applicant and the petition does not comply with the requirements of par. (b).
30.209(1m)(f)2. 2. The objection contained in the petition is not substantive. The department shall determine that an objection is substantive if the supporting facts contained in the objection appear to be substantially true and raise reasonable grounds to believe that the provisions of this subchapter may be violated if the activity or project is undertaken.
30.209(1m)(fm) (fm) If the department denies the petition, the department shall send the petitioner the denial in writing, stating the reasons for the denial.
30.209(1m)(g) (g) If the department grants a petition under this subsection, the department shall refer the matter to the division of hearings and appeals in the department of administration within 15 days after granting the petition unless the petitioner and the applicant agree to an extension.
30.209(2) (2)Administrative hearings.
30.209(2)(a)(a) An administrative hearing under this subsection shall be treated as a contested case under ch. 227.
30.209(2)(b) (b) If a stay under sub. (1m) (c) is in effect, the hearing examiner shall, within 30 days after receipt of the referral under sub. (1m) (g), determine whether continuation of the stay is necessary to prevent significant adverse impacts or irreversible harm to the environment pending completion of the hearing. The hearing examiner shall make the determination based on the request under sub. (1m) (c), any response from the applicant under sub. (1m) (e), and any testimony at a public hearing or any public comments. The determination shall be made without a hearing.
30.209(2)(c) (c) A hearing under this section shall be completed within 90 days after receipt of the referral of the petition under sub. (1m) (g), unless all parties agree to an extension of that period. In addition, a hearing examiner may grant a one-time extension for the completion of the hearing of up to 60 days on the motion of any party and a showing of good cause demonstrating extraordinary circumstances justifying an extension.
30.209(2)(d) (d) Notwithstanding s. 227.44 (1), the department shall provide a notice of the hearing at least 30 days before the date of the hearing to all of the following:
30.209(2)(d)1. 1. The applicant.
30.209(2)(d)2. 2. Each petitioner, if other than the applicant.
30.209(2)(d)3. 3. Any other persons required to receive notice under the rules promulgated under s. 30.208 (5).
30.209(3) (3)Judicial review.
30.209(3)(a)(a) Any person whose substantial interest is affected by a decision of the department under sub. (1m) (a) 1. or 2. may commence an action in circuit court to review that decision.
30.209(3)(b) (b) Any party aggrieved by a decision of a hearing examiner under sub. (2) may commence an action in circuit court to review that decision.
30.209 History History: 2003 a. 118, 326, 327.
30.2095 30.2095 Limits and conditions for permits and contracts.