Lake Winnebago comprehensive project. 30.203(1)(1)
Authorization. The department may implement a project to place structures or fill or both on the beds of lakes Winnebago, Butte des Morts, Winneconne and Poygan for any of the following purposes:
30.203(1)(a)
(a) To improve navigation or to provide navigation aids.
30.203(1)(b)
(b) To restore or protect wetland habitat or water quality.
30.203(1)(c)
(c) To create, restore or protect fish and wildlife habitat.
30.203(1)(d)
(d) To enhance the natural aesthetic value or improve the recreational use of these lakes.
30.203(2)
(2) Location of structures and fill. Any structure or fill placed as part of the project authorized under
sub. (1) shall be located in Winnebago County as follows:
30.203(2)(a)
(a) In Lake Winnebago within the area that consists of the S-1/2 of Sec. 14, T. 17 N., R. 17 E., and the N-1/2 of Sec. 23, T. 17 N., R. 17 E.
30.203(2)(b)
(b) In Lake Butte des Morts within an area that consists of the N-1/2 of Secs. 1 and 2, T. 18 N., R. 15 E., the S-1/2 of Secs. 25, 26 and 27, T. 19 N., R. 15 E., the E-1/2 of Sec. 34, T. 19 N., R. 15 E., and Secs. 35 and 36, T. 19 N., R. 15 E.
30.203(2)(c)
(c) In Lake Winneconne and Lake Poygan within an area that consists of the W-1/2 of Secs. 6 and 7, T. 19 N., R. 15 E.; the E-1/2 of Secs. 1 and 12 and the NE-1/4 of Sec. 2, T. 19 N., R. 14 E.; and the S-1/2 of Sec. 26, the SE-1/4 of Sec. 27, and the E-1/2 of Sec. 35, T. 20 N., R. 14 E.
30.203(2)(d)
(d) In Lake Poygan within an area that consists of the W-1/2 of Sec. 36, T. 20 N., R. 14 E.; the NW-1/4 of Sec. 1, T. 19 N., R. 14 E.; the E-1/2 of Sec. 33, all of Sec. 34, and the W-1/2 of Sec. 35, T. 20 N., R. 14 E.; and the N-1/2 of Sec. 4, T. 19 N., R. 14 E.
30.203(3)(a)(a) Before beginning any activity involving the placement of a structure or fill as part of the project authorized under
sub. (1), the department shall do all of the following:
30.203(3)(a)2.
2. Prepare plans and gather any other information necessary to effectively evaluate the structural and functional integrity of the structure or fill.
30.203(3)(a)3.
3. Hold a public informational meeting to discuss the plans prepared under
subd. 2.
30.203(3)(a)4.
4. Approve the project if it finds that the structure or fill is structurally and functionally sound and that the structure or fill will comply with the requirements under
sub. (4).
30.203(3)(b)
(b) The department shall determine the manner in which and to whom notice will be given of the public informational meeting held under
par. (a) 3.
30.203(4)
(4) Requirements for structures and fill. A structure or fill placed as part of the project authorized under
sub. (1) shall meet all of the following requirements:
30.203(4)(a)
(a) It may not reduce the effective flood flow capacity of the Wolf River or the Fox River above the point where the Fox River flows into Lake Butte des Morts.
30.203(4)(c)
(c) It may not cause material injury to the rights of a riparian owner who owns land that abuts a navigable waterway that is affected by the project.
30.203(4)(e)
(e) It may not be detrimental to the public interest.
30.203(5)
(5) Oversight and maintenance by the department. 30.203(5)(a)(a) The department shall monitor the project authorized under
sub. (1) to assure that the project is furthering a purpose specified in
sub. (1).
30.203(5)(b)
(b) The department shall maintain the structures and the fill that are part of the project authorized under
sub. (1) to assure that the structures and fill do not impair the safety of the public.
30.203(5)(c)
(c) The department shall maintain the structures and the fill that are part of the project authorized under
sub. (1) in a manner that does not impair the natural aesthetic value of the area, to the extent practicable.
30.203(5)(d)
(d) The department shall maintain the structures and the fill that are part of the project authorized under
sub. (1) so that they remain in compliance with the requirements listed under
sub. (4).
30.203(5)(e)
(e) If the department determines that any structure or any fill that is part of the project authorized under
sub. (1) does not comply with the requirements under
sub. (4), the department shall modify the structure or fill to bring it into compliance. If the department cannot modify the structure or fill to bring it into compliance, the department shall remove the structure or fill.
30.203(6)(a)(a) Any structure or fill placed as part of the project authorized under
sub. (1) may be used only for any of the following:
30.203(6)(a)1.
1. As a site for the placement of navigation aids approved by the department.
30.203(6)(a)2.
2. Activities to protect or improve wildlife or fish habitat, including the placement of fish or wildlife habitat structures approved by the department.
30.203(6)(b)
(b) The department may promulgate rules to reasonably limit use by the public under
par. (a) 3.
30.203(7)
(7) Ownership; jurisdiction. The structures or fill that are part of the project authorized under
sub. (1) are owned by the state and are under the jurisdiction of the department. The state may not transfer ownership of a structure or any fill that is part of the project authorized under
sub. (1).
30.203(8)
(8) Exemptions. Section 30.12 does not apply to activities that are necessary for the implementation or maintenance of the project authorized under
sub. (1).
30.2035
30.2035
Shoreline protection study. The department shall conduct a study on shoreline protection measures, including the use of seawalls, and on the environmental impact that these measures may have. No later than June 1, 1996, the department shall complete the study and shall distribute the results of the study, including the department's findings and recommendations, to the appropriate standing committees of the legislature in the manner provided under
s. 13.172 (3). The recommendations shall include any proposed legislation or rules that are necessary to implement the recommendations. Any rules that the department proposes to implement the recommendations of the study shall be submitted for review by the legislative council staff under
s. 227.15 (1) no later than 7 months after the study is completed.
30.2035 History
History: 1993 a. 421.
30.2037
30.2037
Big Silver Lake high-water mark. The ordinary high-water mark of Big Silver Lake in the town of Marion in Waushara County shall be set by the department at 867 feet above mean sea level as determined under U.S. geological survey standards.
30.2037 History
History: 1997 a. 27.
30.204
30.204
Lake acidification experiment. 30.204(1)
(1)
Authorization. Between May 15, 1984, and January 1, 2008, the department is authorized to conduct a lake acidification experiment on the lake specified under
sub. (2).
30.204(2)
(2) Lake selection. The department shall select Little Rock Lake in the town of Arbor Vitae, Vilas County, township 41 north, range 6 east, for the lake acidification experiment.
30.204(3)
(3) Experiment. In conducting the lake acidification experiment, the department shall deny access to and prohibit navigation on the lake by posted notice, may place a barrier or dyke across the lake, may place chemicals or other substances in the lake and may take other actions necessary for the experiment.
30.204(4)(a)(a) Before artificially acidifying the lake, the department shall establish an escrow account containing sufficient funds to restore the lake and its aquatic life as provided under
par. (c).
30.204(4)(b)
(b) After the department has artificially acidified the lake, it may allow and monitor the natural restoration of the lake and its aquatic life as part of the experiment.
30.204(4)(c)
(c) At the conclusion of the experiment or in the event of an unanticipated occurrence that requires that the lake be restored before the conclusion of the experiment, the department shall do all of the following to the fullest extent possible given available technology:
30.204(4)(c)1.
1. Artificially restore the lake to its original acid level if the lake has not been naturally restored to the original acid level during the experiment.
30.204(4)(c)2.
2. Artificially reestablish the lake's aquatic life if the aquatic life has not been naturally reestablished during the experiment.
30.204(5)
(5) Exemption from certain statutes and rules. Activities of the department in conducting the lake acidification experiment are exempt from any prohibition, restriction, requirement, permit, license, approval, authorization, fee, notice, hearing, procedure or penalty specified under
s. 29.601 (3),
30.01 to
30.03,
30.06 to
30.16,
30.18 to
30.29,
30.50 to
30.99,
59.692,
87.30,
287.81,
299.15 to
299.23,
299.91,
299.95 or
299.97 or
chs. 281,
283 or
289 to
292 or specified in any rule promulgated, order issued or ordinance adopted under any of those sections or chapters.
30.204(6)
(6) Compliance with environmental impact statute. The department shall comply with the requirements under
s. 1.11 in conducting the experiment authorized by this section. The department shall initiate compliance by preparing and reviewing, under the procedures it has established under
s. 1.11, an environmental assessment for this experiment.
30.204 Note
NOTE: 1983 Wis. Act 421, which created this section, has "legislative findings" in section 1.
30.205
30.205
Water resources development projects. The department may cooperate with and enter into agreements with the appropriate federal agencies for the purpose of constructing, maintaining and operating water resources development projects. Such agreements may contain any indemnification provisions required by federal law.
30.205 History
History: 1987 a. 27.
30.206
30.206
General permits. 30.206(1)(1)
Procedure for issuing general permits. 30.206(1)(ag)
(ag) To ensure that the cumulative adverse environmental impact of the activities authorized by a general permit is insignificant and that the issuance of the general permit will not injure public rights or interests, cause environmental pollution, as defined in
s. 299.01 (4), or result in material injury to the rights of any riparian owner, the department may impose any of the following conditions on the permit:
30.206(1)(ag)1.
1. Construction and design requirements that are consistent with the purpose of the activity authorized under the permit.
30.206(1)(ag)2.
2. Location requirements that ensure that the activity will not materially interfere with navigation or have an adverse impact on the riparian property rights of adjacent riparian owners.
30.206(1)(ag)3.
3. Restrictions to protect areas of special natural resource interest.
30.206(1)(am)
(am) In addition to the general permits required under
par. (a), the department may issue a general permit authorizing an activity for which an individual permit is issued, or a contract is entered into, under this subchapter. In issuing general permits under this paragraph, the department shall establish requirements and conditions to ensure that the activities subject to the permit will cause only minimal adverse environmental impacts, will not materially interfere with navigation, and will not have an adverse impact on the riparian property rights of adjacent riparian owners.
30.206(1)(ar)
(ar) A permit issued under
par. (a) or
(am) is in lieu of any permit or contract that would otherwise be required for that activity under this subchapter.
30.206(1)(b)
(b) Except as provided in
sub. (1r), a general permit issued under
par. (a) or
(am) is valid for a period of 5 years, and an activity that the department determines is authorized by a general permit remains authorized under the general permit for a period of 5 years from the date of the department's determination or until the activity is completed, whichever occurs first, regardless of whether the general permit expired before the activity is completed. The department may renew or modify, or revoke a general permit issued under
par. (a) or
(am) or
s. 30.2065 upon compliance with the requirements under
subs. (2b) and
(2m).
30.206(1r)
(1r) Transitions between permits. Any general permit issued under this section that is valid on August 1, 2012, shall remain valid until the date upon which a general permit issued under
sub. (1) (a) or
(am) that authorizes the same activity becomes effective.
30.206(2b)(a)(a) The department shall provide to interested members of the public notices of its intention to issue, renew, modify, or revoke a general permit under
sub. (1) (a) or
(am) or
s. 30.2065. Procedures for providing public notices shall include all of the following:
30.206(2b)(a)2.
2. Providing a copy of the notice to any person or group upon request of the person or group.
30.206(2b)(a)3.
3. Publication of the notice through an electronic notification system established by the department.
30.206(2b)(a)4.
4. Publication of the notice on the department's Internet Web site.
30.206(2b)(am)
(am) For the purpose of determining the date on which public notice is provided under this subsection, the date on which the department first publishes the notice on its Internet Web site shall be considered the date of public notice.
30.206(2b)(b)
(b) The department shall provide a period of not less than 30 days after the date of the public notice during which time interested persons may submit their written comments on the department's intention to issue, renew, modify, or revoke a general permit under
sub. (1) (a) or
(am) or
s. 30.2065. All written comments submitted during the period for comment shall be retained by the department and considered by the department in acting on the general permit.
30.206(2b)(c)
(c) Every public notice issued by the department under
par. (a) shall include a description of any activities to be authorized under the general permit.
30.206(2m)(a)1.1. The department shall provide an opportunity for any interested state agency or federal agency or person or group of persons to request a public hearing with respect to the department's intention to issue, renew, modify, or revoke a general permit under
sub. (1) (a) or
(am) or
s. 30.2065. Such request for a public hearing shall be filed with the department within 30 days after the provision of the public notice under
sub. (2b) and shall indicate the interest of the party filing the request and the reasons why a hearing is warranted.
30.206(2m)(a)2.
2. The department shall hold a public hearing upon a request under
subd. 1. if the department determines that there is a significant public interest in holding such a hearing. Hearings held under this section are not contested cases under
s. 227.01 (3).
30.206(2m)(b)
(b) Public notice of any hearing held under this subsection shall be provided in accordance with the requirements under
sub. (2b). The public notice shall include the time, date, and location of the hearing, a summary of the subject matter of the general permit, and information indicating where additional information about the general permit may be viewed on the department's Internet Web site. The summary shall contain a brief, precise, easily understandable, plain language description of the subject matter of the general permit.
30.206(3)
(3) Procedures for conducting activities under general permits. 30.206(3)(a)(a) A person wishing to proceed with an activity that may be authorized by a general permit under this section or
s. 30.2065 shall apply to the department, with written notification of the person's wish to proceed, not less than 30 days before commencing the activity authorized by a general permit. The notification shall provide information describing the activity in order to allow the department to determine whether the activity is authorized by the general permit and shall give the department consent to enter and inspect the site, subject to
s. 30.291. The department may make a request for additional information one time during the 30-day period. If the department makes a request for additional information, the 30-day period is tolled from the date the person applying for authorization to proceed receives the request until the date on which the department receives the information.